Laserfiche WebLink
#OS-3109 <br /> ' Mny 16,2005 <br /> Page 3 of 6 <br /> _ number of problems, most notably water damage. The construction of a new building is <br /> out of necessity, not an increase in congregation size or higher intensity of use. <br /> The applicant h1s already obtained the necessary approvals from the Minnehaha Creek <br /> Watershed District <br /> LOT ANALYSIS WORSHEET <br /> Lot Area/Width <br /> I�1�—1C �ot Elrea _ _ I��t Width _ _ <br /> Required 21,780 s.f. (%2 acre) 100' <br /> Actual 59,383 s.f. (1.36 acres) 163.42' <br /> Setbacks: 50' setbacks are required adjacent to all residentially zoned areas due to the <br /> conditional use where 30' front and rear setbacks and 10' side setbacks are nonnally <br /> re uired in the LR— 1 C zonin district) <br /> LR- 1C Required Existing Proposed <br /> Froiit 5 0' 68.5' S1.5' <br /> Rear 50' 235' 220' <br /> Left Side (east) 50' 68.5' building 71' building <br /> 47' overhang 62' overhang <br /> Right Side (west) 50' S1.3' S1' <br /> Structural Covera e <br /> Total Lot Area Total Structural Coverage • <br /> Allowed: 8,907.5 s.f. (15%) <br /> 59,383 s.f. (1.36 acres) Proposed: 4,434 s.f. (7.5%): contains <br /> building footprint and drive up overhang <br /> on east side of building <br /> Hardcover CaIculations: Almost the entire property is located within the 500'-1,000' <br /> lake setback zone, with the exception of the southwesfi corner of the property measuring <br /> 1,150 square feet in area. It is ui�lown how ihe applicant came up with the property <br /> area of the 500'-1,000' zone shown on the worksheets, however staff has made the <br /> necessary corrections, which puts the proposed hardcover percentage slightly l�igher than <br /> originally thought. <br />