My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
07/19/2004 Planning Commission Minutes
Orono
>
Planning Commission
>
2004
>
07/19/2004 Planning Commission Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/9/2012 11:02:44 AM
Creation date
3/9/2012 11:02:44 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
MINUTES OF THE <br /> ORONO PLANNING COMMISSION MEETING <br /> MONDAY, JULY 19, 2004 <br /> 6:00 o'clock p.m. <br /> *3. #04-3035 MARK D. STROBEL,525 HUNTER PASS, CONDITIONAL USE PERMIT, <br /> PUBLIC HEARING (6:01-6:04 p.m.) <br /> Chair Rahn asked for public comments. There were none. <br /> Rahn moved, Fritzler seconded,to recommend approval of Application#04-3035, Mark D. <br /> Strobel, 525 Hunter Pass, granting a conditional use permit to allow plumbing in an accessory <br /> building in order to construct a bathroom consisting of a toilet, sink and shower within the <br /> existing pool cabana, and stipulating the applicant executes the covenant provided within the <br /> Zoning Ordinance stating the use will not be used for a home occupation, dwelling unit or <br /> rented/leased. <br /> VOTE: Ayes 7, Nays 0. <br /> OLD BUSINESS <br /> 4. #04-3007 HAROLD AND MILDRED BOWER, 1925 LAKEVIEW TERRACE, <br /> VARIANCE, PUBLIC HEARING (6:05-6:18 p.m.) <br /> Marc Brickman, Coldwell Banker/Burnet Realty, 19400 Hwy. 7, Excelsior, MN,representing the <br /> applicants, was present. <br /> Gundlach referred to new information received since the last staff reports were provided to the <br /> Planning Commission, as outlined on Page 2 of the July 15, 2004 Staff Report: <br /> • MCWD approved the wetland delineation as presented by the applicants. <br /> • City Engineer provided comments regarding stormwater management implications of <br /> amending the wetland map and allowing the lot to be buildable. <br /> • City Attorney provided an opinion regarding the City's obligation to amend the City's <br /> wetland map. <br /> • City wetlands consultant, John Smyth, indicated there is currently no wetland basis to <br /> deny buildability of the site. <br /> Gundlach advised there is no basis to deny the buildability of the lot but if the City's wetland map is <br /> amended and the applicant is allowed to construct a home on the lot, staff recommended ten <br /> conditions, as listed on Page 3 of the July 15, 2004 Staff Report, that need to be met. <br /> Chair Rahn asked for public comments. There were none. <br /> Bremer asked Mr. Brickman what his role was in this matter. Mr. Brickman explained that he is the <br /> listing agent for the Bower's and had facilitated in providing the required information from the <br /> Bower's. He stated the Bower's had diligently complied with requests from the City, MCWD and <br /> Hennepin County. <br /> Bremer asked Mr. Brickman if the applicants had any problems with the ten proposed conditions. <br /> Mr. Brickman indicated the applicants' understand the proposed conditions and that he was <br /> authorized to speak on behalf of the applicants. <br /> Gundlach illustrated the subject property location and the implications of the proposed conditions. <br /> Page 2 of 13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.