Laserfiche WebLink
� I�C��JND SLOPE WIDTH & LEIVGTH I-andslope > 1°Io slope <br /> .�. <br /> (l�ndsl�pe greater� than 1%) ,�y �, �over� � ., , <br /> l. Downslope absorption width = absorption width (F) _ o� oo�,o�:aog�° , ° <br /> ninus rock layer width (D2) _ 6��To�,sou <br /> [ t /� r -��._. ��.. r ci�,,,s�.,�P,+ n <br /> c}ev^•/� lt- lL� �lt- _ ' / lt Separe[io�i���f� ft _,� <br /> - Res�ricHng Layer <br /> Upslope idlhiC2d) Rock dth(D2) �"'nslo 'Wid1h(C7i) <br /> ?. Calculate mound size _ _ ----�c�-<< f� <br /> JPSLOPE <br /> �. Depth of clean sand fill at upslope edge of q�����o�{yjdlh-Sand(� <br /> �ock layer = 3 ft minus the distance to restricting layer (C1) �,,;�r° <br /> 3ft - ��-r- ft = l•� ft <br /> �. Mound height at the upslope edge of rock D-34: SLOPE MULTIPLIER TABLE <br /> ayer = depth of clean sand for separation (G2a) Land ursLorE DOWNSLOPE <br /> �7 Slop e mullipliers for various multiP liers for various <br /> l{. U�SIOI7e.' eUge �lUs depth of rock layer (1 ft) �n% slope ratios slope ratios <br /> �lus depth of cover (1 ft) s:i g:i s:i e:i �:i s:� 3:i 4:1 s:l 6:1 �:1 <br /> �� ft + 1ft + 1ft = 3 +(� lt 0 3.0 4A 5.0 6.0 7.0 8.0 3.0 4.0 5.0 6.0 7.0 <br /> �. Upslope berm multiplier based on land slope 1 2.91 3.85 4.76 5.66 6.54 7.41 3.09 4.17 5.26 6.38 7.53 <br /> �� ��,'�', <br /> (see figure D-34) 2 2•83 3.70 9.54 5.36 6.14 6.90 3.19 4.35 5.56 6.82 8.14 <br /> 3 2.75 3.57 9.35 S.OB 5.79 6.45 3.30 4.59 5.88 732 8.86 <br /> i. Upslope width = berm multiplier (G2c) times <br /> 9 2.68 3.95 4.17 4.84 5.46 6.06 3.41 4.76 6.25 7.89 9.72 <br /> zpslope mound height (G2b): <br /> [ t 5 2.61 3.33 4.00 9.62 5.19 5.71 3.53 5.00 6.67 8.57 10.77 <br /> �����a�.�Y� X ��;�i�.� 1 t = �(� 1 t 6 2.54 ��3.23,3 3.85 4.41 4.93 5.91 3.66 5.2 7.14 9.38 12.07 <br /> �OWNSLOPE 7 2.48 3.12 3.70 4.23 9.70 5.13 3.80 5.56 7.69 ]0.34 13.73 <br /> '.. DTOp lIl elE'_Vat1�I1 = I��ClC 1c1yeI� W1Utll �D2� t1ITleS 8 ZA2 3.03 3.57 4.05 4.99 4.88 3.95 5.88 8.33 11.54 15.91 <br /> �ercent landslope (C5) = 100 9 2.36 2.94 3.45 3.90 9.30 4.65 4.11 6.25 9.09 13.04 18.92 <br /> 1 C� 1t X (ea % - IQ� _ � �? lt 10 2.31 2.86 3.33 3.75 9.12 9.44 4.29 6.67 70.00 15.00 23.33 <br /> . Downslope mound height= depth of clean ll 2.26 2.78 3.23 3.61 3.95 9.26 9.98 7.14 11.1] 17.65 30.93 <br /> '�and for slope difference (G2e) at downslope � 2_Zl Z•70 3.12 3.99 3.80 4.08 9.69 7.69 12.SD 21.43 93.75 I <br /> ock edge plus the mound height at the <br /> �pslope edge of rock layer (G2b) <br /> .^��, ft + r �? ft = .(.� ft <br /> ;. Downslope berm multiplier based on percent land slop > > <br /> S`•a.�-' (see figure D-34) ..„ c�`{ _., <br /> i. Downslope width = downslope multiplier µ '�dJ � } <br /> ` Upslop�y�Widt}i(G2d) <br /> G2g) times downslope mound height (G2� �?� `� " <br /> ��.'���� `.' X 1J^4'" ft = .-1-�'--ft �m Upslo.peWidth(G2d) RockBed � � UpsopeWidth(G2d) <br /> � tt..i ft Wid[h(D2) �� ft <br /> . Select the greater of G1 and G2h as the � Length(U3) r.��,; ' � <br /> lownslope width: /� ft � <br /> � Downslope Width(G2i)_�ft <br /> AbSorpHon Widt}�(F)� :� <br /> Total mound width is the sum of upslope �� <br /> vidth (G2d) width plus rock layer width . ., ���� _, _. f <br /> D2) plus downslope width (G2i) <br /> �L� lt + - Total Length(G2k) t.-) ft <br /> ��c, ft + ;�'�� ft = ft <br /> . Total mound length is the sum of upslope width (G2d) <br /> �lus rock layer length (D3) plus upslope width (G2d) <br /> �? ft + (����' ft + I �? ft = ��' feet <br /> ! , �,. , . ��;, `�:>� � F���dl �1r�exis�On�o <br /> -�<, x � �'.��� ' <br /> hereby certify that I have completed this work in accordance witiz applicable ordinances, rules and laws. <br /> �j�`.�__ �'�, r' , { , _____.._._ �,' `r <br /> (signature) �.,_l�' (license #) �r? �^����� -� P�'? (date) <br />