My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2001-P04001 - attached deck
Orono
>
Property Files
>
Street Address
>
D
>
Dahl Road
>
4070 Dahl Road - 07-117-23-11-0019
>
Permits/Inspections
>
2001-P04001 - attached deck
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 5:29:54 PM
Creation date
6/14/2016 1:20:18 PM
Metadata
Fields
Template:
x Address Old
House Number
4070
Street Name
Dahl
Street Type
Road
Address
4070 Dahl Rd
Document Type
Permits/Inspections
PIN
0711723110019
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
9. INSTALLATION OF SOFFIT <br /> • The four pieces of soffit that are of equal length are for the gable ends, <br /> install these first. The other pieces fit in along the sides of the building. <br /> Before applying, trace vent onto back of soffit plywood and cut an <br /> opening small enough so that the vent will cover the cut-out. Note: It is <br /> possibie to instali uents into the gabie ends also. <br /> 1 O. INSTALLATION OF DOORS <br /> • Install doors by putting a spacer under the doors and then aligning <br /> them. Leave a space of at least 1 /4 inch. Tlp: A fwo deep layer of <br /> roofing shingles between the floor and the doors works weil. Use enough <br /> nails to fasten the hinge boards securely. Temporarily tack the hinge <br /> boards and check operation before completely nailing. Measure the <br /> distance from outside of one hinge board to outside of the other hinge <br /> board and cut from the lx4 piece with 45° angle already cut. Install <br /> single lx2 above first, as a door stop, then attach sides. (For double <br /> doors: remaining lx4 will be nailed to the back of stationary door where <br /> doors come together.) Install hardware as desired. <br /> 11. INSTALLATION OF CORNER TRIM <br /> • Install lx4 inch pieces for corner trim. Nail lx4 with square ends <br /> flush with end wa11 siding while holding tight to underside of rafter. <br /> Next, with angled lx4 upward, nail piece flush with corner trim on side. <br /> Repeat for all corners. <br /> 12. SHINGLE ROOF <br /> • Start at the eaves of the building and work toward the ridge. The <br /> starter course is made of shingles turned upside down, and the first <br /> course is nailed directly on top of the starter course, but offset half a <br /> tab. The shingles should extend 3/4 inch past the roof edging on the <br /> sides and ends of the building. Use the nails provided and place nails <br /> in the seal-down strip. Four nails are needed for each shingle. Each <br /> course of shingles is offset a minimum of 6 inches side to side and is <br /> exposed to the top of the tab to the weather. (see fig 12-1) Note: For <br /> m.ore detail, please refer to the instruction.s on the bundies of shingies. <br />,� <br />
The URL can be used to link to this page
Your browser does not support the video tag.