Laserfiche WebLink
7. ROOF PLYWOOD INSTALLATION <br /> • Install roof plywood flush with the fascia and toward the peak. Ti.p: <br /> To m,ake in.stalIation of the first sheet easier, it is recommended that na.ils <br /> be driuen into the top of the fascia, and the nails then be bent up. These <br /> nails wili keep the sheet from sliding off the roof. (see fig. 7-1) Note: If the <br /> edge of first sheet is not parallel with the rafters, you will need to re- <br /> level the building (the building has sunken into the ground and needs <br /> to be brought back to level). <br /> naii <br /> rafter <br /> bent naii <br /> fascia <br /> fi g. 7-1 <br /> 8. INSTALI,ATION OF ROOF EDGING <br /> • Pieces of lx2 material are now installed to cover the exposed edges of <br /> the roof plywood. Tip: It is usually easier to install sides first, and then <br /> the ends. (see fig. 8-I) <br /> roof edging (1�x2} <br /> roof plywood fascia <br /> fig. 8-1 <br />