Laserfiche WebLink
Old Crystal Bay Road Reconstruction <br />Cost Estimate for Improvements <br />Optional Old Highway 12 Sanitary Sewer Replacement <br />Item Unit Quantity Unit Price Total Price <br />Mobilization LS 1 5,000.00$5,000.00$ <br />Remove sanitary manhole EA 4 500.00$2,000.00$ <br />Remove existing 8" sanitary sewer LF 1450 5.00$7,250.00$ <br />Remove sanitary sewer service LF 50 4.00$200.00$ <br />Bypass Pumping LS 1 6,000.00$6,000.00$ <br />Abandon sanitary sewer pipe LF 250 5.00$1,250.00$ <br />Abandon sanitary manhole EA 1 500.00$500.00$ <br />Jack 24" steel pipe under TH 112 LF 100 300.00$30,000.00$ <br />8" PVC sanitary sewer pipe, 15-20' deep LF 200 60.00$12,000.00$ <br />Pipe burst 8" Truss Pipe to 8" PVC LF 1450 40.00$58,000.00$ <br />Install 48" diameter manhole EA 6 3,000.00$18,000.00$ <br />8" x 6" PVC Wye/Service Connection EA 2 2,500.00$5,000.00$ <br />6" Sanitary Sewer Service Pipe LF 100 25.00$2,500.00$ <br />Extra depth manhole LF 72 120.00$8,640.00$ <br />Connect to existing sanitary sewer EA 5 1,000.00$5,000.00$ <br />Restoration LS 1 7,500.00$7,500.00$ <br />Estimated Construction Cost 168,840.00$ <br />+30% Contingencies, Fees, Capitalized Interest, and Bonding 50,652.00$ <br />Total Estimated Cost 219,492.00$ <br />A-6 <br />Item #10 - CC Agenda - 10/25/2010 <br />Old Crystal Bay Road Reconstruction Feasability Study [Page 36 of 42]