Laserfiche WebLink
Old Crystal Bay Road Reconstruction <br />Cost Estimate for Improvements <br />Optional Medina Forcemain Replacement <br />Item Unit Quantity Unit Price Total Price <br />Mobilization LS 1 2,500.00$2,500.00$ <br />Remove Existing 4" FM LF 1850 5.00$9,250.00$ <br />Remove MH EA 1 500.00$500.00$ <br />Bypass Pumping LS 1 5,000.00$5,000.00$ <br />4" PVC Forcemain LF 1850 35.00$64,750.00$ <br />Cleanout Manhole EA 1 5,000.00$5,000.00$ <br />Connect to existing forcemain EA 1 1,500.00$1,500.00$ <br />Connect to existing sanitary sewer EA 1 1,500.00$1,500.00$ <br />Estimated Construction Cost 90,000.00$ <br />+30% Contingencies, Fees, Capitalized Interest, and Bonding 27,000.00$ <br />Total Estimated Cost 117,000.00$ <br />A-5 <br />Item #10 - CC Agenda - 10/25/2010 <br />Old Crystal Bay Road Reconstruction Feasability Study [Page 35 of 42]