My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10-25-2010 Council Packet
Orono
>
City Council
>
2010
>
10-25-2010 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/10/2015 10:41:18 AM
Creation date
2/24/2012 10:08:16 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
274
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Old Crystal Bay Road Reconstruction <br />Cost Estimate for Improvements <br />Optional Medina Forcemain Replacement <br />Item Unit Quantity Unit Price Total Price <br />Mobilization LS 1 2,500.00$2,500.00$ <br />Remove Existing 4" FM LF 1850 5.00$9,250.00$ <br />Remove MH EA 1 500.00$500.00$ <br />Bypass Pumping LS 1 5,000.00$5,000.00$ <br />4" PVC Forcemain LF 1850 35.00$64,750.00$ <br />Cleanout Manhole EA 1 5,000.00$5,000.00$ <br />Connect to existing forcemain EA 1 1,500.00$1,500.00$ <br />Connect to existing sanitary sewer EA 1 1,500.00$1,500.00$ <br />Estimated Construction Cost 90,000.00$ <br />+30% Contingencies, Fees, Capitalized Interest, and Bonding 27,000.00$ <br />Total Estimated Cost 117,000.00$ <br />A-5 <br />Item #10 - CC Agenda - 10/25/2010 <br />Old Crystal Bay Road Reconstruction Feasability Study [Page 35 of 42]
The URL can be used to link to this page
Your browser does not support the video tag.