Laserfiche WebLink
Old Crystal Bay Road Reconstruction <br />Cost Estimate for Improvements <br />Optional Additional Roundabout <br />Item Unit Quantity Unit Price Total Price <br />Remove Concrete Curb and Gutter LF 215 3.50$752.50$ <br />Sawcut bituminous LF 90 5.00$450.00$ <br />Remove Bituminous Pavement SY 430 2.00$860.00$ <br />Concrete curb and gutter LF 1850 11.00$20,350.00$ <br />Common Excavation CY 740 10.00$7,400.00$ <br />Geotextile Fabric SY 1110 1.75$1,942.50$ <br />Subgrade Prep SY 1110 1.50$1,665.00$ <br />Class 5 Aggregate Base TN 1220 16.00$19,520.00$ <br />7" Concrete Truck Apron SY 360 20.00$7,200.00$ <br />Bituminous Trail SY 90 30.00$2,700.00$ <br />Roundabout Landscaping LS 1 25,000.00$25,000.00$ <br />Lighting LS 1 24,000.00$24,000.00$ <br />Estimated Construction Cost 111,840.00$ <br />+30% Contingencies, Fees, Capitalized Interest, and Bonding 33,552.00$ <br />Total Estimated Cost 145,392.00$ <br />A-7 <br />Item #10 - CC Agenda - 10/25/2010 <br />Old Crystal Bay Road Reconstruction Feasability Study [Page 37 of 42]