My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10-25-2010 Council Packet
Orono
>
City Council
>
2010
>
10-25-2010 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/10/2015 10:41:18 AM
Creation date
2/24/2012 10:08:16 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
274
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Old Crystal Bay Road Reconstruction <br />Cost Estimate for Improvements <br />Base Sanitary Sewer and Water Main <br />Sanitary Sewer Improvements Unit Quantity Unit Price Total Price <br />Remove sanitary manhole EA 7 500.00$3,500.00$ <br />Remove existing 8" sanitary sewer LF 1570 5.00$7,850.00$ <br />Bypass Pumping LS 1 8,000.00$8,000.00$ <br />8" PVC sanitary sewer, 10-15' deep LF 870 45.00$39,150.00$ <br />8" PVC sanitary sewer, 15-20' deep LF 700 50.00$35,000.00$ <br />6" PVC sanitary sewer LF 100 45.00$4,500.00$ <br />Install 48" diameter manhole EA 8 2,200.00$17,600.00$ <br />Extra depth manhole LF 85 120.00$10,200.00$ <br />Connect to existing sanitary sewer EA 8 2,000.00$16,000.00$ <br />Estimated Construction Cost 141,800.00$ <br />+30% Contingencies, Fees, Capitalized Interest, and Bonding 42,540.00$ <br />Total Estimated Cost 184,340.00$ <br />Water Main Improvements Unit Quantity Unit Price Total Price <br />Temporary water system LS 1 20,000.00$20,000.00$ <br />Remove existing water main LF 2320 5.00$11,600.00$ <br />Remove existing hydrant EA 6 500.00$3,000.00$ <br />8" PVC water main LF 2200 25.00$55,000.00$ <br />6" PVC water main LF 20 20.00$400.00$ <br />6" DIP water main LF 100 50.00$5,000.00$ <br />8" GV and Box EA 5 1,750.00$8,750.00$ <br />6" GV and Box EA 7 1,500.00$10,500.00$ <br />8" 45 Degree Bend EA 2 250.00$500.00$ <br />8" x 8" Tee EA 4 600.00$2,400.00$ <br />8" x 6" Tee EA 8 500.00$4,000.00$ <br />Connect to existing water main EA 9 2,000.00$18,000.00$ <br />Install hydrant EA 6 3,000.00$18,000.00$ <br />Estimated Construction Cost 157,150.00$ <br />+30% Contingencies, Fees, Capitalized Interest, and Bonding 47,145.00$ <br />Total Estimated Cost 204,295.00$ <br />Summary of Improvements - Base Utilities <br />Sanitary Sewer 184,340.00$ <br />Water Main 204,295.00$ <br />Total 388,635.00$ <br />A-4 <br />Item #10 - CC Agenda - 10/25/2010 <br />Old Crystal Bay Road Reconstruction Feasability Study [Page 34 of 42]
The URL can be used to link to this page
Your browser does not support the video tag.