Laserfiche WebLink
City of Orono Project No: 000139-10047-0 <br />Old Crystal Bay Road Reconstruction Page 25 <br />TABLE 2– PROPOSED BASE IMPROVEMENT COST SUMMARY – OPTION 2: ROUNDABOUTS <br />Description Estimated Cost <br />Sanitary Sewer $184,340 <br />Water Main $204,295 <br />Storm Sewer $355,186 <br />Street Improvements $2,302,900 <br />TOTAL $3,046,721 <br /> TABLE 3– PROPOSED ADDITIONAL IMPROVEMENTS COST SUMMARY <br />Description Estimated Cost <br />Medina Forcemain Replacement $117,000 <br />Sanitary Sewer Replacement–Old Highway 12 $219,492 <br />Additional Roundabout (Option 2 Only)$145,392 <br />City Hall Parking Lot Improvements $41,360 <br />Sidewalk along W side of Old Crystal Bay Road <br />Concrete $110,743 <br />Bituminous $95,002 <br />Enhanced Pedestrian Crossings <br />Option A: In-Street Pedestrian Signs $15,600 <br />Option B: Imprinted Pavement $62,400 <br />Option C: LED Signing $109,200 <br />12’ Median $33,784 <br />Additional Median/Roundabout Landscaping <br />Option A:$260,000 <br />Option B:$422,500 <br />Option C:$799,500 <br />The cost estimates included in this report do not include the cost of obtaining easements or additional <br />right-of-way required for the project. <br />Item #10 - CC Agenda - 10/25/2010 <br />Old Crystal Bay Road Reconstruction Feasability Study [Page 28 of 42]