Laserfiche WebLink
. , <br /> May 18,2015 <br /> 3928 Cherry Avenue <br /> Page 2 of 2 <br /> e. The drainage swale shown on the northeast side of the house must be constructed in such a way as <br /> to keep the surface and roof runoff on the property and not deposit it on the property to the north. <br /> It is not clear how the water will move between the end of the retaining wall and the property line. <br /> Please clarify <br /> f. The average lakeshore setback appears to not be accurately shown on the survey. The average <br /> lakeshore setback is measured by showing the lakeward most points of home on either side of the <br /> property by a line drawn between them. The lakeward most point of the home to the north is <br /> shown, but it does not appear to correctly depict the lakeward most point of the home to the south. <br /> Please note any new proposed structure must be set back behind the average lakeshore setback line. <br /> 2. Hardcover Calculations. The property is located in Tier 1 of the Stormwater Quality Overlay District. <br /> Although hardcover calculations are shown the survey, please have the hardcover calculations prepared <br /> using the City's hardcover calculation worksheets. Attached is a copy of our hardcover information packet. <br /> 3. Separate City Permits Required for: <br /> a. Sewer disconnect <br /> b. Sewer reconnection <br /> c. PLEASE NOTE, NEW 2015 PERMIT REQUIREMENT: Prior to the commencement of � <br /> exterior/landscaping improvements, i.e. patios, grading, sidewalks, retaining walls, etc., a Zoning <br /> Permit will be required. <br /> Your project may trigger the Minnehaha Creek Watershed District's (MCWD) permitting requirements; please contact <br /> the MCWD directly at 952-471-0590 regarding your project. Please note, the City of Orono will not issue a building <br /> permit without a copy of MCWD permits or documentation from the MCWD stating the proposed project does not <br /> trigger any of their permitting requirements. The above information is required in order for the plan review to <br /> continue. Please feel free to contact me at 952.249.4620 or by email at cmatrson@ci.orono.mn.us if you have any <br /> questions on the above requirements. <br /> Sincerely, <br /> CITY OF ORONO <br /> ,V��1,W <br /> Christine Mattson <br /> Planning Assistant <br /> c Sven Gustafson via email <br /> Randy Stern via email <br /> Lyle Oman, Building Official <br /> enclosures <br />