Laserfiche WebLink
BARBOUR/LADOUCEUR ARCHITECTS, P.A. <br /> wiTH DWELL PARTNERS, LLC <br /> MILLER-ARTEMIUK HOME <br /> NEW CONSTRUCTION <br /> ORONO, MN <br /> Doors and Windows <br /> 1) All exterior windows and French Doors shall be by Andersen. <br /> a) Window Schedule provide in the Drawings. <br /> 2) The"Architectural Woodwork Quality Standards" by Architectural Woodwork Institute shall appty and <br /> by reference are made part of this Specification. <br /> 3) AWI quality grade: Custom or better. <br /> 4) Guarantee: Manufacturer's Lifetime Warranty. This guarantee shall be submitted to the Owner in <br /> writing in duplicate. This guarantee is required on wood doors. <br /> 5) Package, handle, transport and store at job site in a manner that will avoid damage or warping. <br /> Store in space where to be installed a minimum of 48 hours before hanging. <br /> 6) Store doors flat on a level surface in a dry, well ventilated building. If doors are stored at the job site <br /> for more than one week, edges should be sealed. <br /> 7) Cover doors(to keep clean and avoid discoloration)with an opaque covering that does not permit <br /> light to penetrate. Covering must allow air circulation. <br /> 8) Doors should not be subjected to extremes of heat and/or humidity conditions. Relative humidity <br /> should not be less than 30% or more than 60%. <br /> 9) Handle with clean gloves and do not drag doors across one another or across other surfaces. <br /> 10) Typical interior doors shall be flush panel hollow core doors(Birch or Maple finish)of sizes shown on <br /> the Drawings. <br /> 11) Package, handle, transport and store doors and windows at job site in a manner that will avoid <br /> damage or warping. Store in space where to be installed a minimum of 48 hours before hanging. <br /> Gvpsum Wallboard <br /> 1) All gypsum board shall be 1/2" USG or equal unless otherwise indicated on plans. All gypsum board <br /> shall have tapered edges with length to be as long as possible to minimize joints. Finish tape all <br /> joints and corners. All exposed gypsum board edges shall be finished with corner bead or with USG <br /> 200 series or 800 series metal trim (fill bead). USG 400 series metal trim will not be permitted. <br /> 2) Moisture resistant gypsum board shall be used at bathroom location and as backing for ceramic wall <br /> tile and at all locations where moisture is a problem. <br /> 3) At ceramic wall tile at showers and at ceramic floor tile provide 1/2" USG "Durock"or equal. <br /> 4) Install long axis of gypsum board perpendicular to long axis of framing members. Framing members <br /> shall not exceed 16 inches o.c. For walls, install against studs with long dimensions starting at top of <br /> stud. Stagger end joints so that no adjacent end joints line up. Run gypsum board through opening <br /> and cut out or cope out gypsum board openings. Run gypsum across ceiling joints. <br /> 5) Apply gypsum board to ceiling and then to wall. To minimize end joints, use wallboard of maximum <br /> practical lengths. Board shall be brought into contact but shall not be forced into place. Where ends <br /> or edges abut, they shall be neatly fitted. Joints on opposite sides of a partition shall be arranged as <br /> to occur on different studs. Fasteners shall not be placed less than 3/8 inches from edges or ends. <br /> 129 N. SECOND STREET SUITE 103 MINNEAPOLIS MN 55401 <br /> 612 339 5093 (PH) 612 339 0499 (FAx) WWW.BAR-LAD-ARCH.COM <br /> Specifications-5 <br />