Laserfiche WebLink
. ; <br /> 3. Install and compact minimum six inches (6") of rock at paved areas adequate to serve as construction <br /> access road and parking for duration of work of the Project. <br /> J. Earthwork at Landscape Areas: <br /> 1. Establish elevations to allow for installation of topsoil and finish materials. Backfill foundation and rough <br /> grade site in such manner so as to establish grade elevations at the building line and uniform slopes, as <br /> shown on the Drawings or directed by the Architect. Exterior grading shall provide permanent, positive <br /> drainage away from the building, without ponding adjacent to walls or within immediate building area. <br /> 2. Site grading contours and elevations shown on the Drawings are schematic and express design intent. <br /> Prior to final grading, review with the Architect all drainage conditions, including possible earth retainage <br /> systems. <br /> 3. Finish grading, installation of boulder retaining walls, re-installation of topsoil, and provision and <br /> installation of irrigation, lawns, plantings and other landscape features are not included in the Work of the <br /> Contract. Coordinate with the Landscape Contractor. <br /> � <br /> 633 SPECIFICATIONS <br /> Page 15 <br />