My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Henn Co hsing rehab deferred loan program
Orono
>
Property Files
>
Street Address
>
B
>
Briar Street
>
1335 Briar Street- PID: 10-117-23-31-0057
>
Correspondence
>
Henn Co hsing rehab deferred loan program
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 3:24:07 PM
Creation date
1/20/2016 3:12:27 PM
Metadata
Fields
Template:
x Address Old
House Number
1335
Street Name
Briar
Street Type
Street
Address
1335 Briar Street
Document Type
Correspondence
PIN
1011723310057
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� URBAN HENNE. .�V COUNTY HOUSING REHABILITN►�ION PROGRAMS <br /> CONTRACTOR BIDDING INSTRUCTIONS <br /> (CONTINUED) <br /> Lead Paint - Exterior and interior paints, enamels and primers used on any surFace in <br /> structures constructed or rehabilitated through the Urban Hennepin County Housing <br /> Rehabilitation Programs will no contain more than six one-hundredths of one per centum <br /> lead by weight (calculated as lead metal) in the total nonvolatile content of the paint or the <br /> equivalent measure of lead in the dried film of paint already applied. <br /> Codes - The contractor shall give all notices required by and comply with all applicable <br /> building codes and regulations of the local building inspection department including the <br /> obtaining of and payment for any required permits; provided that the contractor shall not <br /> be held responsible for pre-existing violations. Except any and all new replaced work <br /> incl�ided in the contract will be required to comply with such codes or regulations. Before <br /> beginning the work, the contractor shall examine the Scope of Improvements for <br /> compliance with the applicable codes and regulations for the new or replaced work and <br /> shall immediately report any discrepancy to the owner or program administrator. <br /> Dama�e to Propertv - When adjacent property is affected or endangered by work done <br /> under contract, it shall be the responsibility of the contractor to take whatever steps are <br /> necessary for the protection of the adjacent property and to notify the owner there of such <br /> hazards. <br /> Surplus Materials - all surplus materials delivered to the job site and all materials, fixtures <br /> and equipment removed and not reused shall remain or become the properly of the <br /> contractor and the subcontractors and shall be removed from the job site promptly after <br /> completion of the work, as well as all rubbish and debris resulting from the contractor's <br /> operations. The premises shall be left in broom-clean condition. <br /> Site Condition - The contractor shall be held to have visited the site and checked with the <br /> owner about the working conditions and the methods of carrying out the work. The owner <br /> shall permit the contractor to use, at no cost, existing utilities, such as light, heat, power, <br /> and water, necessary to carry out the completion of the work. <br /> General Contractor - The contractor shall be responsible for the fitting of all work and for <br /> the coordination of the operations of all trades, subcontractors or material persons as <br /> required for proper completion of the rehabilitation work. <br /> Bid Re�ection - Bids or proposals will be submitted at the bidder's risk. The owner and/or <br /> administrating entity reserves the right to reject any or all bids or proposals. <br /> page 2 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.