My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Henn Co hsing rehab deferred loan program
Orono
>
Property Files
>
Street Address
>
B
>
Briar Street
>
1335 Briar Street- PID: 10-117-23-31-0057
>
Correspondence
>
Henn Co hsing rehab deferred loan program
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 3:24:07 PM
Creation date
1/20/2016 3:12:27 PM
Metadata
Fields
Template:
x Address Old
House Number
1335
Street Name
Briar
Street Type
Street
Address
1335 Briar Street
Document Type
Correspondence
PIN
1011723310057
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
. � SCOPE OF IMPROVE�►.cNTS AND WORK PROPOSAL <br /> PROGRAM: CDBG Deferred Loan Program <br /> PROPERTY: 1335 Briar Street, Orono <br /> I. PLUMBING - All work perFormed shall be in compliance with the State and local <br /> applicable plumbing code requirements. The system shall be in a health-safe and in <br /> proper working order. Contractor shall be responsible for obtaining all necessary permits <br /> prior to starting work. <br /> $ 1. Add/repair drain, waste and vent on kitchen sink to code. <br /> $ 2. Install new kitchen faucet fixture; polished chrome, dual or single lever <br /> (owner's choice). Kohler or equal. <br /> $ 3. Install in new waste, vent and water lines for new bathroom on main <br /> floor to code. <br /> $ 4. Install a new, white vitreous china water closet; floor mounted with <br /> closed coupled tank; water saver, with an anti-siphon ballcock, water <br /> shut-off valve, new flange/wax ring seal and seat. Kohler"Wellworth" <br /> or equal (1.6 low flush). <br /> $ 5. Install new, one-piece cultured marble vanity top with oval bowl, back- <br /> splash and no-drip ledge. Install new polished chrome faucet fixture, <br /> one or two-handle (owner's choice). Delta or equal. Install on <br /> prefinished oak base cabinet. Owner's choice of color. Specify <br /> cabinet size <br /> $ 6. Install a new, white, fiberglass shower/tub fixture complete with anti- <br /> scald faucet fixture for bathtub/shower; chrome in color, thermostatic <br /> or pressure-balancing type with showerhead of 3gpm flow control. <br /> Delta or approved equal. <br /> $ 7. Remove tub, toilet, and sink in basement. Cap sewer and vent lines <br /> to code. <br /> $ 8. Install a new, single-compartment, fiberglass laundry tub. Mustee or <br /> equal. Install a new faucet fixture, non-thread or with a #8-8A tested <br /> and approved, or equal, hose connection vacuum breaker. Install <br /> new hot and cold water hose bibs. Plumb. Haul away old tub. <br /> Consult owner for preferred location. <br /> $ 9. Install temperature pressure relief valve on water heater with drop tube <br /> to code. <br /> $ 10 Code plumbing system. Specify all other plumbing code work not <br /> listed above and the cost per work item. <br /> Bid submitted by (subcontractor/tradesperson) <br />
The URL can be used to link to this page
Your browser does not support the video tag.