My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Project Packet
Orono
>
Property Files
>
Street Address
>
B
>
Brown Road South
>
420 Brown Road South - 03-117-23-42-0010
>
Land Use
>
83-735, SUBD
>
Project Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/17/2026 1:32:37 PM
Creation date
4/17/2026 1:28:42 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
114
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
GENERAL CONDITIONS <br />ARTICLE I —DEFINITIONS <br />Wherever used in these General Conditions or in the other <br />Contract Documents, the following terms have the meanings <br />indicated which are applicable to both the singular and plural <br />thereof. <br />Addenda —Written or graphic instrume,its issued prior to the <br />opening .vf Bids which clarify, corre.t or change the bidding <br />documents or the Contract Docum _nts. <br />Agreement —The written agreement between OWNER and <br />CONTRACTOR covering the Work to be performed; other <br />Contract Documents are attached to the Agreement and made <br />a part thereof as provided therein. <br />Application for Payment —The form accepted by <br />ENGINEER which is to be used by CONTRACTOR in re- <br />questing progress or final payment and which is to include <br />such supporting documentation as is required by the Contract <br />Documents. <br />Bid —The offer or proposal of the Bidder submitted on the <br />prescribed form setting forth the prices for the Work to be <br />performed. <br />Bonds —Bid, performance and payment bonds and other it <br />struments of security. <br />Change Order —A written order to CONTRACTOR signed by <br />OWNER authorizing an addition, deletion or revision in the <br />Work, or an adjustment in the Contract Price or the Contract <br />Time issued after the effective date of the .agreement. <br />Contract Documents —The Agreement, addenda (which per <br />fain to the Contract Documents), C ONTRACTOR's Bid <br />(including documentation accompanving the Bid and anv <br />post -Bid documentation submitted prior to the Notice of <br />Award) when attached as an exhibit to the Agreement, the <br />Bonds, these General Conditions, the Supplementary Condi- <br />tions, the Specificaiions, the Diawings as the same are more <br />specifically identified in the Agreement, together with all <br />Modifications issued after the execution �,f the .Agreement. <br />Contract Price —The moneys payaole by OWNER to CON- <br />TRACTOR under the Contract Documents as state+ in the <br />Agreement <br />Cont?. r Time —The number of days (computed as provided <br />in paragraph 17.2) or the date stated in the Agreement for the <br />�omplerion of the Work. <br />CONTRACTOR —The person, firm or corporation with <br />whom OWNER has entered into the .Agreement. <br />dap --A calendar day of twenty -tour hour measured from <br />midnight to the next midnight <br />defective —An adjective which when modifying the word <br />Work refers to Work that is unsatisfactory, faulty or defi- <br />cient, or does not conform to the Contract Documents or does <br />not meet the requirements of any inspection. test or approval <br />referred to in the Contract Documents, or has been damaged <br />prior to ENGINE.ER's recommendation of final payment. <br />Drawtngs—The drawings which show the character and scope <br />of the Work to be performed and which have been prepared <br />or approved by ENGINLr.R and are referred to in the Con- <br />tract Documents. <br />effective date of the Agreement—fhe date indicated in the <br />Agreement on watch if becomes effective, but if no such date <br />is indicated it means the date on which the Agreement is <br />signed and delivered by the last of the two parties to sign and <br />deliver. <br />ENGINEER —The person, firm or corporation named as such <br />in the Agreement. <br />Field Order —A written order issued by ENGINEER which <br />orders minor changes in the Work in accordance with para- <br />graph 10.2 but which does not involve a change in the Con- <br />tract Price or the Contract Time. <br />General Requirements —Sections of Division I of the Specifi- <br />cations. <br />Nodijcation—fat A written amendment of the Contract <br />Documents signed by both parties, 1b) a Change Order, or (c) <br />a Field Order. A modification may only be issued after the <br />effective date of the Agreement. <br />vottce of Award —The written notice by OWNER to the ap- <br />parent successful Bidder stating that upon compliance by the <br />apparent successful Bidder with the conditions precedent <br />enumerated therein. within the time specified, OWNER will <br />sign and deliver the Agreement. <br />Nonce to Proceed —A written notice given by OWNER to <br />CONTRACTOR ( with a copy to ENGINEER) fixing the date <br />on which the Contract Time will commence to run and on <br />which CONTRACTOR shall start to perform his obligation <br />under the Contract Ikxuments. <br />OWNER— The public body or authority, corporation, associ- <br />ation, partnership, or individual with whom CONTRACTOR <br />has entered into th Agreement and for whom the Work is to <br />he provided <br />Prom(i—The total construction of which the Work to he pro- <br />vided under the Contract Documents may he the whole, or a <br />part as indicated elsewhere in the Contract Documents <br />Resident ProXcr Represenrattie—The authorized repvresenta <br />use o: ENGINEER who :s assigned to the site or an% 7,art <br />thereat <br />
The URL can be used to link to this page
Your browser does not support the video tag.