Laserfiche WebLink
an <br />W <br />M <br />Safetv and Protection <br />6.20 thru 6.21 <br />Samples <br />6.23 <br />r, <br />Schcdule of Shop Drawing Submission~ <br />2.6. 14.1 <br />Schedule of Values <br />2.6, 14.1 <br />Shop Drawings and Samples <br />h.23 thru 6.29 <br />A <br />Shop Drawings -definition (it <br />I <br />�. <br />Site, Visits to -by Engineer <br />9.2 <br />Specifications -definition of <br />I <br />Starting Construction, Before <br />2.5 thru 2 0 <br />Starting the Project <br />2.4 <br />Stopping Work -by Contractor <br />15.3 <br />Stoppin- Work -by Owner <br />13 10 <br />Subco ctor -definition of <br />I <br />�! <br />S.- cx ..factors -in general <br />6.8 thru 6.11 <br />Substantial Completion -certification of <br />.4.8 <br />Substantial Completion --definition of <br />I <br />Subsurface Conditions <br />4.2. 4.3 <br />Supplemental Costs <br />11.4.5 <br />Surety -consent to payment <br />14.12. 14.14 <br />Surety -notice of changes <br />10.5 <br />Surety-q uali ficat ton of <br />!.1. 5.2 <br />Suspending Work, by Owner <br />15.1 <br />Suspension of Work and Termination -in general <br />15 <br />Superintendent -Contractor's <br />6.2 <br />Supervision and Superintendence <br />6.1.6.2 <br />Taxes-Pavment by Contractor <br />6.15 <br />Termination -by Contractor <br />15.5 <br />Termination -by Owner <br />15.2 thru 15.4 <br />Termination, Suspension of Work and - n general <br />I g <br />Tests and Inspections <br />13.3 thru 13.' <br />Time, Change of Contract <br />12 <br />Time, Computation of <br />11.2 <br />Time, Contract -definition of <br />I <br />Uncovering Work <br />13.8. 13.9 <br />Unit Prices <br />1 1.3.1 <br />Unit Prices -Adjustment of <br />11.9 <br />Use of Premises <br />6.16. 6.17. 6.18 <br />qN <br />ttr <br />Values. Schedule of <br />14.1 <br />v isits to Site -by Engineer <br />9.1 <br />Waiver of Claims -on Final Pavmeni <br />14 16 <br />n11 <br />Waiver of Rights by Insured Parties <br />5.10 <br />Warranty and Guarantee -by Contractor <br />13.1 <br />M <br />Warranty of Title, Contractor's <br />14.3 <br />Work, Access to <br />13 2 <br />we <br />Work by Otherc -in general <br />Work, Cost of <br />11 4• 11.5 <br />Work Continuing During Disputes <br />6.29 <br />Work-detintion of <br />I <br />.� <br />Work. Neglected by Contractor <br />13 14 <br />Work, Stopping by Contractor <br />I't � <br />Work, Stopping by Owner <br />I ` I thru 15 4 <br />