Laserfiche WebLink
0110 <br />Shop Drawings —All drawings, diagrams, illustrations, sched- <br />ules and other data which are specifically prepared by CON- <br />TRACTOR, a Subcontractor, manufacturer, fabricator, sup- <br />plier or distributor to illustrate some portion of the Work <br />and all illustrations, brochures, standard schedules, perform- <br />ance charts, instructions, diagrams and other information <br />prepared by a manufacturer, fabricator, supplier or distrib- <br />utor and submitted by CONTRACTOR to illustrate material <br />or equipment for some portion of the Work. <br />Specifications —Those portions of the Contract Documents <br />consisting of written technical descriptions of materials, <br />equipment, construction systems, standards and work- <br />manship as applied to the Work and certain administrative <br />details applicable thereto <br />Subcontractor —An individual, firm or corporation having a <br />direct contract with CONTRACTOR or with am' other Sub- <br />contractor for the performance of a part of the Work at the <br />site <br />Substantial Compiterion—The Work (or a specified part <br />thereof) has progressed to the point where, in the opinion of <br />ENGINEER as evidenced by his definitive certificate of Sub- <br />stantial Completion, it is sufficiently complete, in accordance <br />with the Contract Documents, so that the Work (or specified <br />part) can be utilized for the purposes for which it was in- <br />tended-, or if there be no such certificate issued, when final <br />payment is due in accordance with paragraph 14.13. The <br />terms "substantially complete" and "substantially com- <br />pleted" as applied to any Work refer to Substantial Comple- <br />tion thereof. <br />Work —The entire completed construction or the various sep- <br />arately identifiable parts thereof required to be furnished <br />under the Contract Documents. Work is the result of per- <br />forming services, furnishing labor and furnishing and incor- <br />porating materials and equipment into the construction, all as <br />required by the Contract Documents. <br />ARTICLE 2—PRELIMINARY MATTERS <br />f�+r <br />Deli very of Bonds: <br />2.1. When CONTRACTOR delivers the executed Agree <br />ments to OWNER, CONTRACTOR shall also deliver it) <br />OWNER such Bonds as CONTRACTOR may be required to <br />furnish in accordant • with paragraph s 1, <br />Copies of Documents: <br />2.2 OWNER shall furnish to CONTRACTOR up to ten <br />copies tunless otherwise specified in the General Require <br />meets) of the Contract Documents as are reasonably neces- <br />sary for the execution of the Work. Additional copies will he <br />furnished, upon request, at the cost of reproduction <br />Commencement of Contract Time: vottce to Proceed: <br />3 The Contract Time will commence to run on the <br />thirtieth day after the effective date of the Agreement, of . if a <br />Notice to Proceed is given, on the day Indicated in the Notice <br />to Proceed; but in no event snail the Contract Time commence <br />to run later than the ninetieth day after the day of Bid opening <br />or the thirtieth day after the effective date of the Agreement. <br />A Nonce to Proceed may be given at any time within thirty <br />days after the effective date of the Agreement. <br />Starting the Project. <br />2.4 CONTRACTOR shall start to perform the Work on <br />the date when the Contract Time :omnences to run, but no <br />Work shall be done at the site prior to the date on which the <br />Contract Time commences to run. <br />Before Starting Constru, (ton <br />2.5 Before undertaking each par of the µ ork. <br />CONTRACTOR shall carefully s•udy and compare the Con- <br />tract Documents and check and verify pertinent figures shown <br />thereon and all applicable field measurements. CON- <br />TRACTOR shall promptly report in writing to ENGINEER <br />any conflict, error or discrepancy which CONTRACTOR <br />may discover; however, CONTRACTOR shall not be liable to <br />OWNER or ENGINEER for failure to report any conflict. <br />error or disc epancy in the Drawings or Specifications. unless <br />CONTRACTOR had actual knowledge thereof or should rea- <br />sonabiv have known thereof <br />2.6. Within ten days after the eff dive date of the Agree- <br />ment (unless otherwise specified in the General Require- <br />ments). CONTRACTOR shall submit to ENGINEER for <br />review and acceptance an estimated progress schedule in- <br />dicating the starting and completion dates of the various <br />stages of the Work, a preliminary schedule of Shop Drawing <br />submissions, and a preliminary schedule of -,slues of the <br />Work <br />Before any work at the site is started, CONTRAC <br />TOR shall deliver to OWNER. with a copy to ENGINEER, <br />certificates (and other evidence of insurance requested by <br />OWNER) which CONTRACTOR is required to purchase and <br />maintain in accordance with paragraphs 5.3 and 5.4. and <br />OWNER shall deliver to CONTRACTOR certificates iand <br />other evidence of insurance requested by CONTRACTOR) <br />which OWNER is required to purchase and maintain in ac <br />corciance with paragraphs 5 6 and a <br />Preconstructlon Conference: <br />8 N ithin twenty days after the effective date of the <br />Agreement, b, t before CONTRACTOR starts the Work at <br />the site, a conference will be held for review and acceptance of <br />the schedules referred to in paragraph 2 6. to establish proce- <br />dures for handling ,hop Drawings and other submittais and <br />for processing Applications for Payment, and to establish a <br />wanking understandine among the parties as to the W ori, <br />