Laserfiche WebLink
Date Application Received: 5/2/08 <br />Date Application Considered as Complete: 5/9/08 <br />60-Day Review Period Expires: 7 /5/08 <br />To: <br />From: <br />Date: <br />Chair Kempf and Planning Commission Members <br />Evelyn Turner, City Planner <br />May 19, 2008 <br />Council <br />Exhibit C <br />Subject: #08-3362 Matt Collins on behalf of Verizon Wireless (tenant), 2345 Blaine <br />Avenue (Navarre Water Treatment Facility) <br />-Conditional Use Permit <br />-Public Hearing <br />Zoning District: LR-IC (0.5 acre, 100 feet) <br />Lot Area: approximately 0.65 acre <br />Lot Width: 112 feet <br />Application Summary: The Applicant requests a conditional use permit to place an <br />emergency generator for its existing antenna facility in the area north of the water tower. <br />The request includes an increase in structural coverage when structural coverage <br />exceeds the allowed 15 percent. <br />Sta.ff Recommendation: Planning Department Staff recommends approval with <br />conditions. <br />Pertinent Zoning Ordinance Sections <br />78-348 Conditional Uses in LR-IC. <br />Sec. 78-911. Purpose. <br />In order to give the district use regulation the flexibility necessary to achieve the objectives <br />of this chapter, in certain districts, conditional uses are permitted, subject to the granting of a <br />use permit. Conditional uses include those uses generally not suitable in a particular zoning <br />district, but which may under some circumstances be suitable. When such circumstances <br />exist, a conditional use permit may be granted. Conditions may be applied to issuance of the <br />permit, and a periodic review of the permit may be required. The permit shall be issued for a <br />particular use and not for a particular person. Because of their unusual characteristics, <br />conditional uses require consideration so they may be located properly with respect to the <br />objectives of this chapter and the comprehensive municipal plan and with respect to their <br />effects on surrounding properties. In order to achieve these purposes, the council is <br />empowered to grant and to deny applications for conditional use permits and to impose <br />reasonable conditions upon the granting of these permits. <br />Sec. 78-916. Granting of permit. <br />(a) The planning commission may recommend and the council may grant a conditional use <br />permit as the use permit was applied for or in modified form, if on the basis of the <br />application and the evidence submitted the city makes the following findings: