Laserfiche WebLink
_ 37-4. Waste and vent lines shall be PVC plastic pine, per <br />code. Completely wrap all concealed waste lines in walls <br />or joist spaces with insulation to deaden sound. Cushion <br />lines wherever they rest on framing members. <br />37-5. All connections shall be thoroughly tested. <br />37-6. All vents extending through the roof shall be <br />behind the ridge line of the house. <br />37-7. Furnish and install the fixtures listed in the F <br />Finish Schedule. Provide all necessary fittings to ins_"11 <br />the fixtures. All faucets and trim is polished chrome. <br />37-8. Furnish and install all other fittings and equipment <br />as follows: <br />a. Shut-off valves for all fixtures (chrome where <br />exposed. <br />b. Shower pans - sheet PVC <br />C. Floor drains in basement and garage -PVC <br />d. Freeze -proof sillcocks <br />e. Loop water line for Owner's softener <br />f. 1/4" water line for refrigerator. Install <br />jwner's refrigerator. <br />g. A.O. Smith or equal, 10 year, glass lined, gas <br />fired, quick recovery 75 gallon water heater. <br />h. Submersible sump pump with PVC discharge at <br />drain tile sump basket. <br />38. WATER SERVICE <br />38-1. Water ser.,ice shall be from a private well located <br />per the site plan. iistall a 4" casing (allow 200 ft. <br />depth;, with a 1-1/2 H.P. high velocity submersible pump, <br />pitleer adaptor, 4" x 4 ft. stainless steel screen, <br />120 aa_4on diaphram type pressure tank, 1-1/4" drop line <br />(allow 105') and service line from well to pressure tank. <br />Provide water testing as required. Provide water meter if <br />required by the City of Orono. <br />39. SEWER SERVICE <br />39-1. Sewer service shall be by an on -site septic system <br />including pre -case underground tanks and mound drainfield. <br />The Owner shall provide the system including the line to <br />the house foundation and cleaning and protecting the mound <br />site and seeding and/or sodding the completed mound. The <br />Owner shall also provide the design of the system. <br />40. HEATING AND AIR CONDITIONING <br />40-1. Provide all labor, materials and equipment necessary <br />for the installation of a combination heating and cooling <br />system consisting of gas -fired forced -air furnaces and <br />electric air conditioners. System shall be designed to <br />property and amply heat and cool all finished and future <br />finished areas of the house, excluding the garages. <br />40-2. Install the system in accord with the requirements <br />of the National Society of Heating and Ventilating Engineers <br />and Minnesota State Regs. <br />40-3. Main floor furnace shall be zoned - 1 zone f - <br />Master Bedroom area and 1 zone for balance of main floor. <br />Tap.off of main floor trunk for supplies to basement areas. <br />Second floor fur ace shall be single zone for 2nd floor <br />only. <br />