My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05-12-1986 Council Packet
Orono
>
City Council
>
1986
>
05-12-1986 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/30/2025 1:10:52 PM
Creation date
12/30/2025 1:00:32 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
341
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
r <br />Zoning File #991 <br />November 20, 85 <br />Page 2 of 2 <br />After the Planning Commission meeting, staff called for a meeting with <br />the architect, project manager and builder. They advised that Ulrich hired <br />an outside contractor to come in and perform the job and that they, the <br />architect, project manager or builder had no knowledge of his intention to <br />move this fast. <br />Staff has advised both those in attendance at this meeting and the <br />supervisor at the site that all grading and filling will cease until the <br />City reviews and acts on the final grading and landscape plan for the site. <br />Staff has allowed the following activities: <br />1. Complete f i l l ing of sewer tre. -•h from Bohn's Point Road. <br />2. Complete ' ack f.iiling around house to save frost <br />footings/fount .ition - this involves filling of crushed rock and top <br />soil from stock pile from foundation excavation. Unfortunately, the <br />crushed rock will be transported by approximately 70 dump trucks. <br />3. Removal of stockpiled dirt. from City right-of-way. <br />Once again, staff can find no problem with the proposed structure. We <br />are dealing with a house of some 33,000 s.f. The foundation excavation and <br />stock piling of earth is not unusual for a hou ,e of this size. The <br />original grading and drainage plans -)w--d nothinc nusal with a house of <br />this size. Staff recommends that we G n,- .top work on the house but stop <br />all grading and filling as outlined above. <br />Please advise me if you -tnt staff to issue citations or limit other <br />activities on the site. <br />
The URL can be used to link to this page
Your browser does not support the video tag.