My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05-12-1986 Council Packet
Orono
>
City Council
>
1986
>
05-12-1986 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/30/2025 1:10:52 PM
Creation date
12/30/2025 1:00:32 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
341
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
TO: Mayor and City Council VT <br />FROM: Mark Bernhardson, City Administrato <br />t� <br />DATE: December 2, 1985 <br />SUBJECT: Ulrich Property, 1535 Bohn's Point Road <br />Jeanne Mabusth and Tom Jacobs met with the project manager and <br />contractor for the subject property on Wednesday, November 27th. <br />At that meeting they discussed their intended landscape plans and <br />conditional use permit. In ad3ition to outlining the permit fees <br />and work that needs to be done prior to the next consideration by <br />the Planning Commission on this matter, it was indicated to these <br />individuals that should any further landscaping work be done <br />which has not been expressly approved by the staff in advance of <br />they work being done will result in a citation to the parties <br />•olved. <br />HEIG'iT OF BUILDING - Having reviewed the applicable ordinances <br />toc,ether with h the site it is our opinion that the height of the <br />building as constructed is legal and under our codes had the <br />house had a different design that conformed to the original <br />contours they could have resulted in a structure that was 4 to 6 <br />feet higher than the one being constructed. The facts of the <br />situation as it relates to this house are as follows: <br />- Basement - Constructed at 933. total 12 foot height. <br />- Grade_ and_Original Building Envelope - Presently <br />investigating the amount of fill that was possibly done <br />on the site prior to issuance of the original foundation <br />permits back in July of 1985. Based on the estimates <br />this filling would have possibly raised the site a <br />maximum of 2 feet. Although not possessing original <br />contours for the site we are aware that the site <br />originally had a ridge that ran through part of it, and <br />in fact, the original topr,raphy in one area where the <br />Ouse is going in was at least 6 feet above what will be <br />_he finished grade for the house. On the other hand <br />there was extensive moving of soils from one area to <br />fill-in in the other area to flatten out the site. <br />Within the purview of the code this is considered normal <br />and usual grading of the site under the exception <br />allowed in section 10.03 subdivision 21. This site <br />mc�lification is within the bounds of site modifications <br />done in several other areas including: <br />1145 <br />Wyndmere Road - <br />Jackson <br />1165 <br />Wyndmere Road - <br />?long <br />1180 <br />Wyndmere Road - <br />Kim <br />3229 <br />Casco Circle B <br />- Swancan <br />- tieight_Of_Building - Both our zoning code and the <br />Uniform Building Code address determination of building <br />height. Our ordinance in all the residential zones <br />allows for 2 1/2 stories or 30 feet. The height of the <br />structure is determined by measuring the mean <br />
The URL can be used to link to this page
Your browser does not support the video tag.