Laserfiche WebLink
#1 <br />Phase 3 Opp ational Enhancement <br />Pro _tc� ror this phase will be defined based on operationdl needs; <br />however, I"',e "ollowing general ground rules apply. The SE and NW <br />areas are for cabin development, while Vz NE area is dedicated to <br />tent camping. A monument has been considered for inclL in the <br />Camp and the building of a year-round house for the camp manager to <br />provide securit. is also a possibility. <br />