My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Project Packet
Orono
>
Property Files
>
Street Address
>
B
>
Big Island
>
100 Big Island - 23-117-23-21-0001
>
Land Use
>
89-1385, CUP
>
Project Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/23/2025 12:58:33 PM
Creation date
12/23/2025 12:54:40 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
88
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Project <br />1A <br />- SE picnic bu'ldino <br />construction <br />Project <br />1@ <br />- PD picnic building <br />construction <br />Project <br />- visitor cer.;,er renovation <br />- foundation <br />and other rr- <br />novation - major on -going <br />project <br />Project <br />10 <br />- PD latrine/shower building <br />construction <br />huildi-i and septic field <br />for 4s and manager's <br />cabin <br />Project <br />1E <br />- J la a/shower building <br />construction <br />buC ii;iy and septic field <br />fo.- 4s + 1 <br />:roject <br />1F <br />- NE ;.ionic building <br />construct <br />Project <br />1G <br />- NE latrine/shower building <br />constructs,.:+: <br />building and septic field <br />(tent camping <br />area) <br />Project <br />1H <br />storage building renovation <br />- limited renovation <br />of <br />storage buildings to repair <br />and improve <br />security <br />Proi-ct <br />1i <br />- NW picnic building <br />Phase 2 - Handicapped Accessible Cabin Construction <br />This phase provide, for the construction of ten handicapped accessible <br />cah'ins ;, the SE a► i. Each cabin will be con—oad to the septic <br />systems installed in -oject 11. Refer to -nment for drawi—, and <br />floor p0n. <br />Project 2A - cdbi;i M1 <br />Project cabin N2 <br />Project .:abin N3 <br />Project .0 - cabin #4 <br />Project 2E - cabin #5 <br />Project 2F - cabin M6 <br />Project 2G - cabin N7 <br />Project 2H - cabi i �;? <br />Oroject 21 - cabin N9 <br />Projer: U - cabin #10 <br />Project 2K - handicappe1 ramp and trail construction <br />improvement of existing hard-surtated trails and building <br />U;i sidewalk.` between cabins and to beach <br />
The URL can be used to link to this page
Your browser does not support the video tag.