(Complete) <br />Project <br />IA - <br />SE picnic shelter construction <br />(Complete) <br />Project <br />1B - <br />DP picnic shelter/bathroom construction <br />Project <br />1C - <br />visitor center renovation - foundation <br />and other renovation - major on -going <br />project <br />(In Progress) <br />Project <br />1D - <br />DP latrine/shower building construction <br />and septic field (will also serve tent <br />campers in NW area) <br />Project <br />1E - <br />SE latrine/shower building construction <br />and septic field (will be designed to <br />serve 15 future cabins) <br />Project <br />IF - <br />NE picnic/latrine/shower building con- <br />struction and septic field (tent camping <br />area) <br />Project 1G - storage building renovation - limited <br />renovation of storage building to repair <br />and improve security <br />Project 1H - NW picnic shelter <br />Phase 2 - Handicapped Accessible Cabin Construction <br />This phase provides for the construction of 15 handicapped accessible <br />cabins in the SE area. Each cabin will be connected to the septic <br />systems installed in project 1E. Refer to attachment for drawing and <br />floor plan. <br />Project <br />2A <br />- cabin <br />#6 <br />Project <br />2B <br />- cabin <br />#8 <br />Project <br />2C <br />- cabin <br />09 <br />Project <br />2D <br />- cabin <br />#7 <br />Project <br />2E <br />- c n <br />#5 <br />Project <br />2F <br />- .,juin 04 <br />Project <br />2G <br />- cabin #3 <br />Project <br />2H <br />- cabin 02 <br />Project <br />2I <br />- cabin #1 <br />Project <br />2J <br />- cabins #15, <br />#14, 013, 012, 011, 010 <br />Project <br />2K <br />- handicapped <br />ramp and trail construction <br />improvement <br />of existing hard -surfaced <br />trails and <br />building of sidewalks between <br />cabins and <br />to beach <br />