My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12-09-1985 Council Packet
Orono
>
City Council
>
1985
>
12-09-1985 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/12/2025 11:37:37 AM
Creation date
12/12/2025 11:27:22 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
344
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
in the dock price for bitumen based upon the delivery date will be added <br />to or deducted from the bid item. The ref ineryused for bidding should <br />be identified. <br />CORREGATED METAL CULVERTS: Corrugated metal culverts shall meet <br />the requirements of MnDot Specification 3226 and shall be <br />rivited. Spiral culverts are not acceptable. <br />METHOD OF PAYMENT: Payment shall be made on the bid price per lineal. <br />foot ocu�ert delivered in each size specified. <br />NOTE: Any bid item requiring materials to be delivered to the City of <br />Orono in contractor's trucks shall be taken to mean at any point on a' <br />public street within the City of Orono as directed by the Director of <br />Public Works. <br />
The URL can be used to link to this page
Your browser does not support the video tag.