My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
07-08-1985 Council Packet
Orono
>
City Council
>
1985
>
07-08-1985 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/4/2025 10:50:28 AM
Creation date
12/4/2025 10:42:10 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
314
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CITY OF ORONO <br />COMPLETION TIME <br />Page 6 <br />The work outlined above will begin immediately upon receipt of <br />the executed contract and will be completed as expeditiously as <br />possible unless delayed for reasons of unexpected emergencies, <br />forces beyond the control of the parties, or by request of a <br />party acquiesced in writing by the other party. If so delayed <br />for more than ,inety (90) days at the request of the CITY, the <br />CONSULTANT reserves the right to renegotiate the contract to <br />account for rising costs before resuming work. <br />Because of the significant public involvement in the process, <br />the actual time required to complete the study will be, in part <br />determined, by the meeting schedule which the Planning <br />Commission and City Council are comfortable with. Based upon <br />the assumption that the Planning Commission will hold monthly <br />workshop meetings throughout this process, we estimate that the <br />Study will take between five and seven months to complete. <br />COST OF SERVICES <br />Because of `he nature of the study we propose to bill for the <br />cost of our services on a time plus materials basis, with an <br />estimate. We will undertake only that work which we feel is <br />essential to complete the study and we will not undertake work <br />which is not authorized by this AGREEMENT, without the prior <br />consent of the City Council. The cost of our services will be <br />billed monthly in accordance with the Standard Rate Sheet <br />attached hereto. <br />Based on the process -,,itlined above, the minimum costs to <br />assemble and produce maps, and assistance from the City <br />Staff wherever possibl „hroughout the study, the estimated <br />costs of services are summarized by phases below. In each <br />case, these costs are presented as a range, and the actual <br />costs will be determined by the circumstances which arise <br />during the course of the Study. <br />Phase One: <br />Three Thousand Nine Hundred Fifty Dollars ($3,95�.00) to <br />Five Thousand Dollars ($5,000.00) <br />Phase Two: <br />Five Hundred Dollars ($500.00) to Seven Hundred Fifty <br />Dollars ($750.00) <br />Phase Three: <br />Five Thousand Two Hundred Ten Dollars ($5,210) to Six Thousand <br />Dollars ($6,000.00) <br />
The URL can be used to link to this page
Your browser does not support the video tag.