Laserfiche WebLink
(14) Cost for purchase and maintenance of roofs, materials, supplies <br />and facilities not consumed during constrâ–º.â–ºction or incorporated in the <br />work. <br />(5) Contractor's capital expense, including interest on Contractor's <br />capital employed for the work. <br />(6) Overhead or general expenses of anv kind, including but not lim- <br />ited to office or fabrication shop overhead or drafting and printing <br />costs, except as may be expressly included in clause 11.3.3.1a above. <br />(7) Costs due to the negligence of Contractor, any subcontractor, <br />anyone directly or indirectly employed by any of them, or for whose <br />acts any of them may be liable, including but not limited to injury or <br />damage to persons or property, the correction of defective work, dis- <br />posal of materials and equipment wrongly supplied, or making good any <br />damage to property. <br />(8) The cost of any item not specifically and expressly included in <br />the terms described in clause 11.3.3.1a above. <br />7. Allowances for profit, overhead and nonreimbursable costs shall be <br />computed as follows: <br />a. For the Contractor <br />(1) A minimum of 5% up to a maximum of 15% (the actual rate dependent <br />of the Contractor's performance and assumed risks as determined in the <br />sole discretion of the Owner) of all reimbursable costs defined in <br />clauses 11.3.3.1a (1) through (12) above, and <br />(2) A minimum of 3% up to a maximum of 7% (as determined at the sole <br />reasonable A- -etion of the Owner) for the work of subcontractors <br />supervised a Contractor as computed in accordance with clause <br />11.3.3. will be allowed on subcontractor work not supervised <br />by the Contractor. <br />(3) For first, second, and other tier subcontractors claiming compen- <br />sation for changed work under clause 11.3.3.1(a) (12), their allow- <br />ances shall be determined at the sole reasonable discretion of the <br />Owner consistent with percentages in subclause (2) directly above. <br />(4) The Owner shall have the right to examine, inspect, copy and <br />audit the books and records of any contractor or subcontractor making <br />claim for reimbursement for costs and allowances hereunder in order to <br />verify the accuracy, correctneRs, completeness :and roperiety of all <br />costs and allowances claimed. <br />- 44 - <br />1/85 - 8507b <br />Copyright 19RS <br />6onestroo, RosenP, Andwrlik <br />4 Associates, Inc. <br />