Laserfiche WebLink
i (8) Losses and expenses, not compensated by insurance or otherwise <br />sustained by the Contractor in connection with the changed work pro- <br />vided they have resulted from causes other than the sole or joint <br />fault or neglect of the Contractor, any Subcontractor, anyone directly <br />or indirectly employed by any of them, or for whose acts any of them <br />may be liable. Such losses shall include settlements made with the <br />written consent and approval of the Owner. No such losses and ex- <br />penses shall be included in the cost of the changed work for the pur- <br />pose of determining the Contractor's fees thereon. If, however, such <br />loss requires reconstruction and the Contractor is placed in charge <br />thereof, he shall be paid for his services an additional fee computed <br />in proportion to the sum stated above for the original changed work. <br />W <br />(9) Cost of "drayage," exclusive of any drayage between shop and job - <br />site, only when Contractor must hire an independent trucking firm and <br />driver to perform special drayage services in performance of the <br />changed work for which Contractor's skills, manpower and vehicles are <br />inadequate. "Drayage" does not include transportation performed or <br />which could have been performed by Contractor's drivers or vehicles <br />but for their use on another project. <br />(10) Costs incurred due to an emergency arising out of the changed <br />work affecting the safety of persons and property. <br />(11) Other costs incurred in the performan— of the changed work if <br />and to the extent approved in advance in writ. ng by the Owner. <br />1>� (12) Cost of subcontractors in performing the Contractor's work as <br />changed shall be computed in accordance with this paragraph 11.3.3, <br />is computed in accordance with clauses 11.3.1, .2, or .3. <br />r# <br />b. The cost of the changed v--k shall exclude: <br />I$ (1) Salaries or other compensation for Contractor's officers, execu- <br />tive, general managers, project managers, estimators, engineers, time- <br />keepers, surveyors, mechanics, warehousemen, auditors, accountants, <br />purchasing and contracting agents, draftsmen (except sheetmetal <br />draftsmen), stenographers, receptionists, and other staff employees, <br />whether or not employed at Contractor's principal office, branch <br />office or field cfice at the job site. <br />�e (2) Expenses of Contractor's principal office, branch office or job <br />site field office, including without limitation the expense for pick- <br />up trucks, office trailers, storage trailers, rental of office or <br />t4 storage space., telephone, heat, llghtA, etc. <br />(3) Ownership cost of malntenan-P expenses for Contractor -owned <br />equipment, including without limitation all construction equipment, <br />trucks and vehicles, machines and all other owned equipment required <br />for Contractor's performance of the Work. <br />i <br />N# <br />a <br />r - 41 <br />(1R5 - 8507b <br />copvright 198S <br />Ronestroo, RosPnAniArIik <br />b Associate_R, Inc. <br />