My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05-28-1985 Council Packet
Orono
>
City Council
>
1985
>
05-28-1985 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/4/2025 10:34:54 AM
Creation date
12/4/2025 10:24:53 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
357
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
8.6.1 The Contractor shall furnish one copy, or stich additional copies as may <br />be required by the Special Provisions, of complete Product Data for every <br />manufacturered item of equipment and all components to be used in the Work, <br />including specific performance data, material description, rating, capacity, <br />working pressure, material gage or thickness, brand name, catalog number and <br />general type. <br />8.6.2 This data shall be compiled by the Contractor and reviewed by the Engi- <br />neer before any of the equipment is ordered. <br />8.6.3 All data shall he indexed according to specification section and para- <br />graph for easy reference. <br />8.6.4 After review, this data shall become a part of the Contract, and may <br />not be deviated from except upon written approval of the Engineer. <br />8.6.5 Product Data for equipment reviewed by the Fngineer does not in any <br />case supersede the Contract Documents. The review by the Engineer shall not <br />relieve the Contractor from responsibility for deviations from Drawings or <br />Specifications unless he has in writing called the Engineer's attention to <br />such deviations at the time of furnishing said data. Nor shall such review <br />relieve the Contractor from responsibility for errors of any sort in the items <br />furnished. The Contractor shall check the Work described by the Product Data <br />with the Contract Documents for deviations and errors. <br />8.6.6 It shall be the responsibility of the Contractor to insure that items <br />to be furnished fit the space available. He shall make necessary field <br />measurements to ascertain space requirements, including those for connections, <br />and shall order such sizes and shapes or equipment that the final installation <br />shall suit the intent and meaning of the Drawings and Specifications. <br />8.6.7 Where equipment requiring different arrargement of connections from <br />those shown is allowed, it shall hP the responsibility of the Contractor to <br />install the equipment so as to allow for proper operation and in harmony with <br />the intent of the Drawings and Specifications, and to make all changes in the <br />work required by the different arrangement of connections. <br />8.6.8 Product Data shall be promptly submitted by the Contractor after he has <br />reviewed, checked and approved the data to determine if they are in harmony <br />with the requirements of the Project and with the provisions of the Contract . <br />Documents and after he has verified all field measurements and construction <br />riteria, materials, catalog numbers and similar data. In submitting the <br />-)duct Data, the Contractor certifies that the work represented by the data <br />.s been coordinated with tht Contract nocuments and all relevant field condi- <br />ions. <br />8.7 QIIALITY OF EOPIPMENT AND MATERIALS • <br />A.7.1 in order to e%t.ahligh standards of giality, the Engineer, in the Spec- <br />ifications, has referred to c certain proAticts by narre and catalog number. This <br />F -. <br />I/AS - RSQSh <br />ropy riRht 1' <br />bonewtroo, Rosene, Anderlil <br />A ♦a■nriaraa_ inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.