My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05-28-1985 Council Packet
Orono
>
City Council
>
1985
>
05-28-1985 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/4/2025 10:34:54 AM
Creation date
12/4/2025 10:24:53 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
357
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
ments of the Specifications, and t,hall not he incorporated into the Work until » <br />reviewed by the Engineer. [f required by Engineer, Contractor shall furnish <br />satisfactory evidence (including reports of required tests) as to the kind and <br />quality of materials and equipment. <br />R.1.3 All materials and equipment shall be applied, installed, connected, <br />erected, used, cleaned and conditioned in accordance with the instructions of <br />the applicable manufacturer, fabricator, supplier or distributor, except as W, <br />otherwise provided in the Contract Documents. <br />8.2 F.UUTVALFNT MATERIALS AND EQUIPMENT <br />Whenever materials or equipment are specified or described in the Drawings or <br />Specifications by using the name of a proprietary item or the name of a par- <br />ticular manufacturer, fabricator, supplier or distributor, the naming of the <br />item is intended to establish the type, function and quality required. Unless <br />the name is followed by words indicating that no substitution is permitted, <br />materials or equipment of other manufacturers, fabricators, suppliers or dis- <br />tributors may be accepted by Engineer if sufficient information is submitted <br />by Contractor to allow Engineer to determine that the material or equipment <br />proposed is equivalent to that named. The procedure for review by Engineer <br />will be as set forth in paragraphs 8.2.1 and 8.2.2 below as supplemented in <br />the General and Specific Requirements. <br />8.2.1 Requests for review of substitute items of material and equipment will <br />not be accepted by Engineer from anyone other than Contractor. Tf Contractor <br />wishes to furnish or use a substitute item of material or equipment Contractor <br />shall make written application to Engineer for acceptance thereof, certifying <br />that the proposed substitute will perform adequately the functions called for <br />by the general design, be similar and of equal substance to that specified and <br />be suited to the came use and capable of performing the same function as that <br />specified. The application will state whether or not acceptance of the sub- <br />stitute for use in the Work will require a change in the Drawings or Specifi- <br />cations to adapt the design to the substitute and whether or not incorporation <br />or use of the substitute in connection the Work is subject to payment of <br />any license fee or royalty. All variations of the proposed substitute from <br />that specified shall be identified in the application and available mainte- <br />nance, repair and replacement service will be indicated. nee application will <br />also contain an itemized estimate of all costs that will result directly or <br />indirectly from acceptance of such substitute, including costs of redesign and <br />claims of other contractors affected by the resulting change, all of which <br />shall be considered by Engineer in evaluating the proposed substitute. Engi- <br />neer may require Contractor to furnish at Contractor's expense additional data <br />about the proposed substitute. Engineer will be the sole judge of acceptabil- <br />ity, and no substitute will he ordered or installed without Engineer's prior <br />written Acceptance. Owner may require Contractor to furnish at Contractor's <br />expense a special performance guarantee or other surety with respect to any <br />substitute. <br />1 !A5 - R`�ft5h <br />�npvright 19A5 <br />Nonestroo, Rosene, An4erlik <br />L Asenciateta_ Tne. <br />
The URL can be used to link to this page
Your browser does not support the video tag.