Laserfiche WebLink
L� <br />be made within the time limits specified and in all other cases within a rea- <br />sonable time after the claim, dispute or other matter in question has arisen, <br />and in no evert shall it be made after the date when institution of legal or <br />equitable proceedings based on such claim, dispute, or other matter in ques- <br />tion would be barred by the applicable statcite of limitations. <br />7.11.3 The Contractor shall carry on the Work and maintain the progress <br />schedule during any arbitration or other legal proceedings, unless otherwise <br />agreed by him and the Owner in writing. <br />7.12 INDEMNIFICATION <br />To the ful1e9t extent permitted by law, the Contractor shall indemnify and <br />hold harmless the Owner and the Engineer and their agents and employees from <br />and against all claims, damages, losses and expenses, including but not lira- <br />' ited to attorneys' fees arising out of or resulting from the performance of <br />Work provided that any such claim, damage, loss or expense (1) is attributable <br />to bodily injury, sickness, disease or death, or to injury to or destruction <br />of tangible property (other than the Work itself) including the loss of use <br />resulting therefrom, and (2) is caused in whole or in part by any negligent <br />act or omission of the Contractor, any Subcontractor, anyone directly or in- <br />directly employed by any of them or anyone for whose acts any of them may be <br />liable, regardless of whether or not it is caused in part by a party indemni- <br />fied hereunder. Such obligation shall not he construed to negate, abridge or <br />otherwise reduce any other right or obligation of indemnity which would other- <br />wise exist as to any party or person described in this Section. <br />In any and all claims against the Owner or the Engineer or any of their agents <br />or employees by any employee of the Contractor, any Subcontractor, anyone <br />directly or indirectly employed by any of them or anyone for whose acts any of <br />them may be liable, the indemnification obligation under this Section shall <br />not be limited in any way by any limitation on the amount or type of damages, <br />compensation or benefits payable by or for the Contractor or any Subcontractor <br />under worker's or workmen's compensation acts, disability benefit act@ or <br />other employee benefit acts. <br />SECTION A <br />MATF.RIALSL EQIIIPMFNT, INSPECTION AND WORKMANSHIP <br />8.1 MATERIALS AND EOUTPMENT FURNISHED BY CONTRACTOR <br />8.1.1 Contractor shall furnish all materials, equipment, labor, transpor- <br />tation, construction equipment and machinery, tools, appliances, fuel, power, <br />light, heat, telephone, water and sanitary facilities and all other facilities <br />and incidentals n-cessary for the execution, tasting, initial operation and <br />completion of the Work. <br />L 9.1.2 All materials used in the Work shall he (if Rood quality, new unless <br />otherwise provided for in the Contract nocuments, shall meet the regiiire- <br />t <br />Copyright 199 <br />Ponestron, Rosen.-, Anderlik <br />6 Assn>ciatos, Inc. <br />