Laserfiche WebLink
necessary to prevent damage or injury tho•reto. He shall , 'ect carefully <br />from disturbance or damage all monuments and property markers ; l an author- <br />ized agent has witnessed or otherwise referenced their location and shall not <br />remove them until directed. <br />5.3 SURVEYS <br />Unless otherwise specified, the Owner shall establish all base lines for the <br />location of the principal component parts of the Work together with a suitable <br />number of bench marks adjacent to the Work. Based c+pon the information pro- <br />vided by the Owner, the Contractor shall develop and make all detail surveys <br />necessary for construction, including batter boards, stakes for pile locations <br />and other working points, lines and elevations. The Contractor shall be re- <br />sponsible for carefully preserving bench marks, reference points and stakes, <br />and, in the case of destruction thereof resulting from his negligence or <br />otherwise, the Contractor shall be charged with the expense and damage result- <br />ing therefrom and shall he responsible for any mistakes that may be caused by <br />the unnecessary loss or disturbance of such bench marks, reference points and <br />stakes. <br />5.4 UTILITIES <br />The contractor shall be solely responsible for verifying the exact location of <br />all utilities, whether or not shown on the Drawings or referenced in the Spec- <br />ifications. Prior to the start of env construction, the Contractor shall <br />notify all utility companies having utilities in the Project area. The Con- <br />tractor shall have sole responsibility for providing temporary support and for <br />protecting and maintaining all existing utilities in tt:e Project area during <br />the entire period of construction, including but not limited to the period of <br />excavation, ha kfill and compaction. in carrying out this responsibility, the <br />Contractor shall exercise particular cart-, whenever gas mains or other utility <br />lines are .rossed, to provide compacted backfill or ether stable support for <br />such lines to prevent any detrimental displacement, rupture or other failure. <br />5.5 INVESTIGATIONS <br />Reference is made to the Contract Documents for identification of those re- <br />ports of investigations and testa of subsurface or ]at,-nt physical conditions <br />at the site or otherwise affecting cost, progress or r-rformance of the Work <br />which have been relied upon by Engineer in preparation of the Drawings and <br />Specifications. Such reports or tests are not guaranteed as to accuracy or <br />completeness and if incorporated into the Contract Documents, they shall be <br />for general information only. Contractor shall be rerponsible for verifying <br />site and subsurface conditions to his satisfaction prior to submitting a bid <br />on the project. <br />5.6 UNFORESEEN PHYtiICAL CONDITIONS <br />Contractor shall immediately notify Owner an <br />surface or latent physical conditions at the <br />differing ma*prially from those indicated or <br />- 1? •- <br />1/85 - H`il15h <br />:opyright 1985 <br />Bonestroo, Rosenp, Anderlik <br />6 AsoociatNm, Inc. <br />d Engineer in writing of any sub - <br />site or �-, au existing structure <br />refer ed ,ci in the contract Ducu- <br />•. <br />s. <br />