My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05-28-1985 Council Packet
Orono
>
City Council
>
1985
>
05-28-1985 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/4/2025 10:34:54 AM
Creation date
12/4/2025 10:24:53 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
357
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
ments. Rngineer will promptly review those conditions and advise Owner in <br />writing if further investigati(in or tests are necessary. Promptly thereafter, <br />Owner shall obtain the necessary , itionai investigations and testa and fur- <br />nish copies to Engineer and Contra,.;ar. If Engineer finds that the results of <br />such investigations or tests indicate that there are subsurface or latent <br />}physical conditions which differ materially from those intended in the Con- <br />tract Documents, and which could not reasonably have been anticipated by Con- <br />tractor, a Change Order shall be issued incorporating the necessary revisions. <br />1 <br />SECTION 6 <br />INSURANCE, AND BONDS, <br />LEGAL RESPONSIBILITY AND P►tBILIC SAFETY <br />6.1 INSI!RANCF. <br />6.1.1 General: The Contractor shall not commence work under this contract <br />until he has obtained all insurance required under this Section and shall have <br />filed the certificate 9f insurance or the certified copy of the insurance <br />policy with the Owner and Engineer. The Contractor shall not allow any Sub- <br />contractor to commence work on his subcontract until all insurance required <br />for the Subcontractor has been obtained. Each insurance policy shall contain <br />a clause providing that it shall not be cancelled by the insurance company <br />without thirty (30) days written notice to the Owner and Engineer of intent to <br />cancel. <br />Certificates of insurance shall he submitted on Standard Form C.I.Ii.C.-701 or <br />ACORD 25 forms and shall specifically note the clause providing for 30 day <br />written notice to the Owner and Engineer of intent to cancel. <br />• 6.1.2 Workmen's Compensation _&_Employer Liability Insurance: The Contractor <br />shall secure and maintgi,. during the life of this Contract, Workman's Compen- <br />sation and Fmplover's Liability Insurance as requirt-' by law for ell his <br />employees to he engaged directly or indirectly in rig work on the project <br />! under this Contract. In case any work is sublet, the 4 tntractor shall require <br />the Subcon+-nctur to similarly provide Workmen's Componsation and Futployer's <br />!► Liability Insurance for all the latter's employees to oe engaged directly or <br />indirectly in such work. The Contractor shall also maintain insurance re- <br />quired under Any other. Employee Benefit Acts in force or required by law at <br />the site of construction. <br />1� <br />N 6.1.1 Contractor Comprehensive ;.,eneral & Automobile 1.iabi1ity: The Confrac- <br />tor shall procure and maintain during the life of this Contract,^.ontra^tor's <br />1 Comprehensive General and Automobile Liability In9arrr:e which s!iall protect <br />» him from claims for damages for personal injury, inc'z,ding accidental death, <br />as w=-Il as From claims for property damage which ma, arise from ,.aerations <br />f under this ontract, whether such operations he by ^imaelf or by any Sub- <br />» i,m1rac'(jt or by Anyone directly or indirectly empt=eyed by either of them. <br />The insuranrt, ;hall be in am.�unts listed below and shall provide :Overage <br />+rrir-r t',e lid l wink !iazerd <br />1 <br />- 13 - <br />1/RS - 8505b <br />Copvright 198S <br />OnnOetroo, Roseno, 4n4o,lil <br />4 AAwociates, Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.