Laserfiche WebLink
2 101 . CLEAR I N1, AND CRUBH I NG <br />Specific Requirements <br />2101.0. SPECIFICATION REFERENCE: Unless otherwise noted or modified herein, <br />all sections of the General Requirements shall apply. <br />2101.3. CONSTRIICTION REQUIREMENTS: The contractor shall remove only those <br />trees specifically designated for removal by the Engineer. No trees shall be <br />removed until the contractor has reviewed tree removal in the field with the <br />Engineer. <br />When trees are designated to be saved at the end of backslopes, the backslopes <br />ahould be modified to avoid root damage. <br />Where overhanging branches are broken by construction activity, the contractor <br />shall promptly trim such branches in a neat and presentable manner. Such work <br />shall he considered incidental to the contract. <br />2101.3.4. Disposal: All timber and debris shall be removed from the project <br />area to a disposal area selected and provided by the contractor. No burying <br />of debris will be permitted. <br />0-8074c <br />Copyright 1985 <br />Bonestroo, Rhsene, Anderlik <br />6 Associates, Inc. <br />