My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05-28-1985 Council Packet
Orono
>
City Council
>
1985
>
05-28-1985 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/4/2025 10:34:54 AM
Creation date
12/4/2025 10:24:53 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
357
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
10. CRACK CONTROL: The contractor shall provide for installation of a <br />Roadglas spot repair system over transverse and longidutinal cracks in the <br />roadway as directed by the Engineer, the roadglas spot repair system will be <br />used when the cracks are 3/8 inch or greater in width. The Roadglas crack <br />repair consists of Roadglas reinforcment and Roadbound binder. Cracks shall <br />he covered by a minimum of 5 inches of roadglas reinforcement on each side of <br />the crack. Special attention is directed to the contractor to provide the <br />required tar kettle to maintain a temperature of the Roadbound binder between <br />350°F and 400°F. <br />Payment shall be at the bid unit price per square foot and include cleaning of <br />the cracks, roadbound binder, Roadglas reinforcement, and all miscellaneous <br />items specified by the manufacturer (Owens Corning Fiberglass) and all other <br />items incidental to complete the placement. <br />11. 1OTN'I' AND ('RACK FILLER: The contractor shall provide for the cleaning <br />and filling; )f all cracks with APE, Ruberized Emulsion crack filler not <br />repaired with the Roadglas Spot Repair System as outlined above. <br />Payment from the joint and crack filler material by the pound as bid in the <br />proposal shall be compensation in full for the emulsified asphalt, cleaning <br />and all other items incidental to complete construction. <br />12. GUARDRAIL: Guardrail shall be placed in accordance with standard Plates <br />8307R and 8319C. Payment for guardrail at the unit price indicated in the <br />proposal shall be compensation for placement of the guardrail, including <br />Twisted end section and all items incidental to complete construction. <br />13. CULVERT REMOVAL. b <br />REPLACEMENT: <br />The contractor <br />will <br />be required to remove <br />the existing culverts <br />and place <br />gravel bedding <br />and <br />insulation prior to <br />replacing the culvert <br />as indicated <br />in Design Detail SP-2. <br />Payment for the <br />installation of the pipe <br />culvert at <br />the unit price <br />bid <br />in the proposal shall <br />be compensatic- <br />placement of <br />the culvert, <br />sand <br />bedding, insulation, <br />( <br />compaction and .!MR incidental <br />to complete the <br />construction. <br />SP-? <br />0-8074c <br />6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.