Laserfiche WebLink
2105. ROADWAY EXCAVATION <br />Specific Requirements <br />2105.O.SPECIFICATION REFERENCE: Unless otherwise noted or modified herein, <br />all sections of the General Requirements shall apply. <br />2101.3. CONSTRUCTION REQUIREMENTS: All excavation shall be to the line and <br />grade as staked by the Engineer. The contractor will be required to grade <br />ditches as shown on the plan. Excess material from the grading shall be <br />removed from the project site by the contents. The contractor shall obtain <br />approval from the City of Orono to deposit excess material within the City <br />limits. <br />The contractor shall place three inches of topsoil on all areas to be seeded <br />or sodded. <br />1 <br />M <br />1# <br />(1! <br />II <br />10 <br />0-8074c <br />M Copyright 1985 <br />Bonestroo, Rosene, Anderlik <br />6 6 Associates, lnc. <br />