My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06-10-1985 Council Packet
Orono
>
City Council
>
1985
>
06-10-1985 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/4/2025 9:31:11 AM
Creation date
12/4/2025 9:21:45 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
385
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
f <br />CM11i t PHTIN9 <br />TO: Mayor and City Council JIT11019cb <br />FROM: Mark Bernhardson, City Administrato t l <br />CITY <br />DATE: June 6, 1985 <br />SUBJECT: Administrator's Summary Information For 6/10/85 <br />The following format is an attempt to summarize for Council items <br />for which direct Council action is not specifically requested at <br />this point. <br />1. Highway 12 Corridor Re ort - At present staff is trying to <br />get back and to worts w;th John Shardlow as to defining the <br />scope of the project together with deciding which items are <br />appropriate for the staff to take and those that are <br />important for the consultant to work on. Based on this we <br />will looking for a revised estimate of cost. As part of this <br />revision we are asking for a quote by phase, with each phase <br />having a go/no-go decision. It is anticipated this will be <br />brought back for Council consideration on June 24th. <br />2. Hennepin Coouunntty VoTech Equine Facili� - There has been <br />rscuss ons on this matter have in -'[sated that: <br />- Medina City Council will consider this at their meeting <br />June 18th <br />- At Medina's request VoTech is studying the feasibility of <br />their main access beinq to County 6 opposite Old Crystal Bay <br />Road. <br />- Long fake has agreed that they will extend their water <br />system if the VoTech desires and that they will allow VoTech <br />within their capacity for sewer. At present the VoTech is <br />talking in the range of 10 to 12 units for their facility, <br />this however could have impact on the capacity of the overall <br />system, both in Medina and Orono, and we are currently <br />looking at the -erall system impact and also segment impacts <br />which pass deg able property in Orono. <br />It has been icated to VoTech that they work through <br />Medina, and Me—na work with Orono as far as the sewer issue <br />is concerned. It has also been indicated that we wil l out- <br />line for the VoTech initially what considervtions will be <br />necessary should that their main access be off 6. <br />Information regarding this consideration wi!I be al vo of <br />importance in the Highway 12 study. <br />
The URL can be used to link to this page
Your browser does not support the video tag.