Laserfiche WebLink
REGULAR tiEETING OF THE ORONO COUNCIL, MARCH 13, 1979 Page 8 <br />The two lot subdivision now involves a 1.9 acii lot <br />SUBDIVISION <br />and a 17.3 acre lot. flr. Olson requests an area <br />4645 BayEide Road <br />variance for the 1.9 acre lot and a setback variance <br />(Continued) <br />for the pole barn. Hardships following code require- <br />ments to the letter would result in an unusual and <br />odd shaped lot. The pole barn is seven feet from <br />Anderson's south property li-e (150' required for a <br />barn - 10' required for an accessory building). The <br />pole barn is 2,400 sq. ft., the State Building Code <br />requires 10' setback from the lot line or the building <br />must be structurally altered to meet code. A one <br />hour fire wall is required and all openings within the <br />wall enclosed. The lot line could be moved three feet <br />to the north along building line and a compensatory <br />southern shift in line could give the necessary two <br />acres. The septic inspector will inspec� the existing <br />systems. Park fee to be determined. <br />Items for consideration: <br />1. Determine use of pole barn <br />2. Can Planning Commission determine a more feasible <br />division line? <br />Planning Commission fleeting - November 27, 1978 <br />Staff reviewed the need to either move lot line at <br />least three additional feet along building line or <br />to require applicant to make necessary structural <br />changes in the building to meet the code. Planning <br />Commission advised that it would be economically more <br />feasible to adjust lot line and, in addition, the lot <br />line should be adjusted to bring the lots to the two - <br />acre minimum requirement. Planning Commission gave <br />conceptual approval to the subdivision subject to <br />north lot line realignment. Public information meeting <br />scheduled for January 22, 1978. <br />Planning Commission fleeting - January 22, 1976 <br />Planning Corinission recommends preliminary approval <br />of the application for subdivision by Robert Olson <br />subject to the following conditions: <br />1. Applicant submitting an accurate survey of the <br />subject property designating setbacks of all <br />structures. <br />2. Staff determination of variances* required: <br />a. which structures are in violation <br />b. degree of variance to be requested by applicant <br />C. review number of animals housed in pole barn <br />(Continued) <br />