® Preliminary Plat Application 13-3591 <br />Bayside Meadows <br />Page 2 <br />may affect peak discharge rates. Therefore, a Final Stormwater Management Plan should be <br />submitted with the Final Construction Plans. Also, an outlet control structure detail should be <br />included with the Final Plans. <br />1.2 Drainage calculations must be submitted as part of the Final Plans to confirm sizing of all culverts. <br />1.3 As part of the Final Plans, Drainage and Utility easements must be placed over the wetland, <br />wetland buffer, stormwater pond, and all ditching and culverts directing runoff to the pond or <br />wetland. The easements should be shown on the Final Plat and Final Street, Utility, and Grading <br />Plans. <br />1.4 The estimated cost of proposed street and utility improvements must be submitted as part of the <br />Final Plat process for determination of the total Letter of Credit amount. A Letter of Credit written <br />to 150% of cost of improvements must be submitted prior to any land disturbing activities. <br />1.5 New development triggers the wetland protection ordinance requirements. Therefore, the <br />following should be considered: <br />a. This wetland is li sted as a "management 2" wetland in the MCWD's Functional Assessment <br />of Wetlands inventory, which requires a 25 foot buffer and 20 foot structure setback. The <br />proposed buffer exceeds and the setback meets City requirements. <br />b. The invasive species listed in the Wetland Delineation Report have been included for control <br />in the Invasive Species Management Plan. <br />c. Wetland Buffer markers are indicated on the plan in accordance with City requirements, at <br />the upland boundary of the buffer edge located at lot lines and changes of buffer edge <br />direction and spaced a maximum 200 feet apart. <br />d. Estimated landscaping costs for vegetation management and buffer establishment will need <br />to be submitted for determina tion of total Letter of Credit amount a s part of the Final Plat <br />process . <br />e. Approved WCA wetland delineations must be provided to the City in a hard copy format as <br />we ll as a CAD or GIS format using Hennepin County coordinates. <br />1.6 Payment of park dedication fees must be submitted to the City prior to Final Plat approval. <br />1.7 The Home Owne r s Agreement (HOA) doc ume nts s hould be s ubmitted for re view prior to Final <br />Plat approval. The following items should be included : <br />a. Road Maintenance Plan <br />b. Pond Maintenance Plan <br />c. Monument Maintenance Plan <br />d. Invasive Species Control <br />1.8 The applicant will be required to obtain Hennepin County approval and permitting for connection <br />to County Road 84 and installation of the culvert in County Right-Of-Way . A copy of any <br />approvals or permits required should be submitted prior to Final Plat Approval. <br />1.9 The applicant will be required to obtain Minnehaha Creek W aters hed District (MCWD) approval <br />and perm itting for erosion co ntrol. A copy of any approvals or permits required should b e <br />s ubmitted prior to Final Plat approval. Since the development i s proposi ng les s than 20% <br />impervious surface, no stormwater management permitting from MCWD should be required. <br />2.0 SITE PLAN: <br />2.1 Per the City of Orono's Resolution No. 3492 approving the plat of Bayview Farms 2°d Addi tion <br />and the agreement between Owners, the dri veway location for 4665 Bayside Road should b e <br />revis e d onto the private road and the access to Bayside Road e liminated. <br />2.2 Protection fencing is shown to be ins talled around potential septic areas to ensure they are not <br />impacte d by construction. The protection fencing locations s hould be inspected and approved by <br />the City Engineer prior to any land disturbing activities.