Laserfiche WebLink
Council <br />Exhibit E <br />@ E3C>LTC>N & ~ENK, INC® <br />Consulting Engineers & Surveyors <br />2638 Shadow Lane, Suite 200 • Chaska, MN 55318-1172 <br />Phone (952) 448-8838 • Fax (952) 448-8805 <br />March 6, 2013 <br />City of Orono <br />Attn: Melanie Curtis <br />PO Box 66 <br />Orono, MN 55323 <br />RE: Preliminary Plat Application 13-3591 <br />www.bolton-menk.com <br />Bayside Meadows (formerly Outlot C, Bayview Farms 2nd Addition) <br />Engineering Review #2 <br />Dear Melanie: <br />As requested, we have completed an engineering review of the documents submitted for the above <br />referenced project. Our current review is based on the following submittal items: <br />• Subdivision Application; dated 1/23/13 <br />• Resolution Approving Preliminary Plat of Bayview Farms 2nd Addition, dated I 0/24/94 <br />• Resolution Approving Final Plat of Bayview Farms 2°d Addition, dated 11/14/94 <br />• Resolution Approving Lot Line Rearrangement of Properties, dated 2/12/96 <br />• Development Narrative prepared by Coffman Development Services, dated 1/23/13 <br />· • Storm water Management Plan prepared by Sathre-Bergquist, dated 1/17 /13 <br />• Geotechnical Memorandum prepared by Haugo Geotechnical Services, dated 1/10/13 <br />• Wetland Delineation Report prepared by Kjolhaug Environmental, dated 10/22/13 <br />• Natural Resources Inventory Memorandum prepared by Kjolhaug Environmental, dated 1/22/13 <br />• MCWD Approval of Wetland Boundary and Reclassification, dated 1/17/13 <br />• Preliminary Plans prepared by Sathre-Bergquist, dated 2/15/13 <br />o Preliminary Site Plan <br />o Existing Conditions Plan <br />o ALTA Survey <br />o Preliminary Plat <br />o Preliminary Grading and Erosion Control Plan <br />o Preliminary Street Plan <br />o Preliminary Planting Plans (3 Sheets) <br />o 250' Aerial Site Plan <br />o Site Conservation Plan <br />• Conservation Design Report memorandum prepared by Kjolhaug Environmental; dated 2/6/13 <br />• Invas ive Species Management Plan prepared by Kjolhaug Environmental; dated 2/26/13 <br />• Engineering Review #I comments responses prepared by Sathre-Bergquis t, dated 2/15/13 <br />We offer the followin g observations, comments, and recommendations for your consideration: <br />1.0 GENERAL: <br />1.1 Drainage calculations for the proposed s tormwater pond currently meet City requirements. <br />Proposed runoff rates will be restricted to less than existing runoff rates . However, plan revisions