My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05-13-1985 Council Packet
Orono
>
City Council
>
1985
>
05-13-1985 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/20/2025 11:32:44 AM
Creation date
11/20/2025 11:24:01 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
362
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
sive Sewer Policy Plan. The plan <br />states that property should <br />be connected <br />to <br />the Municipal Sew.°r System whenever <br />a sewer lateral serves the <br />property or <br />is <br />within a reasonable distance of the property. <br />The proposed sanitary sewer for the Art Center of Minnesota will require <br />the construction of the Crystal Bay Sewer Improvement (Project 85-1) and <br />extensions of the sanitary sewer lines as outlined herein. <br />The service line for the Old School building would be extended off Briar <br />Street. The serv:ce l'ne for the Main Building would come at the west end of <br />Prospect Avenue and require a 90 foot extension of the sanitary sewer line <br />proposed on the Crystal Bay project. <br />COST ESTIMATES <br />Cost estimates have been prepared for the extension of sanitary sewer to <br />the Art Center of Minnesota. The project costs provided in this section <br />include the cost of the Crystal Bay improvement project 85-1. The cost <br />estimates include Legal, Engineering and Administration. <br />85-1 Crystal Bay $900,000 <br />Art Center Extension 5,000 <br />TOTAL $905,000 <br />4 - <br />0-1389c <br />
The URL can be used to link to this page
Your browser does not support the video tag.