4.11.3 Shop Drawings shall 1)P submitted according to the following <br />schedule: <br />(a) Three copies shall be submitted with reasonable promptness and <br />in such sequence as to prevent delay of the Work. <br />(b) The Engineer shall, within fourteen (14) da? the submittal <br />of any Shop Drawings, return one copy to the Contractor market' with <br />corrections and changes. <br />(c) The Contractor shall then promptly correct the Sh,' Drawings to <br />conform to the corrections and changes requested by the Engineer. <br />(d) Following completion of such corrections and changes, the <br />Contractor shall promptly furnish the Engineer two copies of the Shop <br />Drawings conforming to the required corrections and changes. <br />4.11.4 Engineer will review with reasonable promptness Shop Drawings and <br />samples, but Engineer's review shall be only for conformance with the <br />design concept of the Project and for compliance with the information <br />given in the Contract Documents and shall not extend to means, methods, <br />sequences, techniques or procedures .,f construction or to safety <br />precautions or programs incident thereto. The review of a separate item <br />as such will not indicate review of the assembly in which the item <br />functions. Contractor shall make any corrections required by Engineer and <br />shall return the required number of corrected copies of Shop Drawings and <br />resubmit new samples for review. Contractor shall direct specific <br />attention in writing to revisions other than the corrections called for by <br />Engineer on previous submittals. Contractor's stamp of approval on any <br />Shop Drawing or Sample shall constitute a representation to Owner and <br />Engineer that Contractor has either determined and verified all <br />quantities, dimensions, field construction criteria, materials, catalog <br />numbers, and similar data or assumes full responsibility for doing so, and <br />that Contractor has reviewed or coordiiated ea�:.h Shop Drawing or sample <br />with the requirements of the Work and the Contract Documents. <br />4.11.5 Where a Shop Drawing or sample is required by the Specificatio- <br />no related Work shall be commenced until the submittal has been revie ed <br />and approved by Engineer. <br />411.6 Engineer's review or approval of Shop Drawings or !-ampies shall not <br />relieve Contractor from responsibility for any deviations from the. <br />Contract Documents unless Contractor has in writing called Engineer's <br />attention to such deviation at the time or submission and Engineer has <br />given written concurrence and approval to the specific deviation, nor <br />shall any concurrence or approval by Engineer relieve Contractor from <br />responsibility for error* or omission,; in the Shop Drnwinga. <br />4.12 l!AL1,1 11F E ' 1 PMENT AND MATFR IAI.S <br />4,12.1 In ordri to f-stahliAli standard- of quality, the Engineer, in the <br />SpHt- itications, has referred to certain products by nam« and catalog <br />152 ha <br />4/AI <br />r ,tt.l <br />