Laserfiche WebLink
24,00^ 5.B. CONCRETE BASE: Concrete hapw, for manhole construction shall be <br />of size and depth as shown on the plans. Concrete used for this purpose shall. <br />consist of one part Portland cement, two parts of clean pharp sand and four <br />parts of gr•ded coarse aggregate. Material used for this purpose shall be <br />sub.jec: to .,.e approval of the Engineer. Base shall be poured on undisturb .d <br />earth prior to setting the precast manhole. section-. Precast concreL bole <br />bases shall he considered equal. <br />24,^00.5.(-. WALLS: Material to he used in a walls of manholes shall be as <br />specified in Section 24,000.2. All external surfaces of concrete block man- <br />holes if permitted shall be plastered with 1 1/2 inch coat of Portland cement <br />c• -tar. Mortar shall contain one part of cement to three parts of suitable <br />"~aster sand. Lime or mortar mix shall be used in amount necessary to make a <br />aklitable mixture for plastering purposes, but not to exceed 15% by volume of <br />cement. Mortar used for laying concrete bin,:., shall consist )f one part Port- <br />land cement to two parts of sand to which lime or morrr,r mix may be addr' not <br />to exceed fifteen percent. (15%) by volume o!-mer.i.. <br />24,0oo.5.U. MANHOLE STEPS: Manhole steps .;ha!t ` ';;e type as specified <br />in Section 2Z_,6 00.?.1. Spacing shall be as sh wn o:i the detailed manhole <br />plat.,, but no' greater than 16 inches in vertical eli-nment. <br />24,00o.5.E. ACING: M�;vH_OLB RINGS & COVERS: The frame or ring casting shall <br />he set to the designation elevation in a full mortar bed. <br />24,000.5.F. DROP MANHOLE INLETS: Encased drop inlets shall be constr, <br />required on the plans and in accordance with the atan�iard Drop Tnl:. <br />Plate. <br />24,000.6. BACKFILLINC, CLEANTNG UP & M. I".1�ING"ES: <br />24,fi00.6.A. BACKFILLINC PROCEDURE AT PTP' 7.0NE: All trenches and excavations <br />sb-it he backtil led ,mm.diately after F laid therein. For backfill up <br />to d tevr•I of one foot over the top of only selected materials free <br />r-­r.k. boulders, de"iia or other hi, id r i t substances, be <br />-sed. ,'he backfilling shall ho placed completel the pipe han.,ches in <br />uniform leyerr, not exceedin„ 4 inches in depth. '.aver shall t-e placed, <br />then c�refuily and uniformly tair ­i to eliminate ,Ossibility of lateral <br />displacement end to proviae unif, -art tel► under the pie, haunches. <br />The backfill ..,iterial %hall h- easary, tamped in 4 inch layers <br />And c oroughl%? ,ompacted ,ins' le of the pipe to pr^vide solid <br />backing ags'nst the external <br />Till" instRl.lat'„R <br />.' backtii <br />oiyl 'oride pint <br />4.;,ill h.... in accor- <br />ce .,t' <br />�.i.4. D-2321 <br />Riven <br />t'..:nmpacting the <br />..•k!ili Trb.._ <br />iai around the <br />pipe t, at least 95 p-rceut >f <br />maximum density to <br />a di9tn,- - of <br />c..• foot h4 v <br />the top i4 the pipe. <br />-' <br />24,000.4S.P. 4ACKFiLL PR0CFrWRE ABOVI� ,0IPF. ZONE: ,'Type "s") Fr.-,, -dare Where <br />%Pttiemrnt ;q RI1nWah,P. .succeeding laver:+ of backfill may contain coarser <br />materials xnd a°ialI he Free from 1•ircrs nt rock, concrete or clay lump mare <br />24,0VO-1' <br />2/A4/45S4h <br />Copertght 1494 <br />So- troo, R.^vene. An'•rlik <br />i Assnciates, Inc <br />