My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
02-11-1985 Council Packet
Orono
>
City Council
>
1985
>
02-11-1985 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/13/2025 11:16:44 AM
Creation date
11/13/2025 11:06:58 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
348
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
A <br />} The contractor shall be required to cut into a plug on the existing force main <br />as shown on the plans. The cut -in shall be incidental to the force main <br />N construction. <br />t <br />The City has applied for permits required from the Burlington Northern <br />Railroad and the Hennepin County Highway Department. All the requirements of <br />these permits shall become a part of these specifications and be fully <br />complied with by the contractor. The contractor shall post any bond required <br />to obtain the permits. <br />N <br />j Dewatering for sewer construction may be required throughout the project to <br />prevent trench water from entering the pipe and to provide suitable conditions <br />M for laying pipe. All dewatering costs required to complete the work shall be <br />1. considered incidental to the project. <br />Existing driveway and street culvert removal is required as a part of this <br />construction. The street and driveway culverts shall he replaced with new 12" <br />(' RCP at the unit price as bid in the proposal. <br />24,000.3.E.5. STAPTLTZATION: Where, in the opinion of the Engineer, unsuit- <br />able material exists <br />below the pipe, rock stabilization <br />shall be used to in- <br />sure proper bedding. <br />Material shall be 3/4 minus rock, <br />well graded and com- <br />pacted in place below <br />the pipe. Contractor's attention <br />is directed to Para- <br />graph 24,000.3.E5, of <br />the General Conditions. <br />Payment for stabilization <br />shall be by the ton in place <br />at the bid price as <br />stated on the proposal <br />and shall include all m;--cellaneous <br />costs. <br />Where, in the opinion of the Engineer, rock stabilization material is being <br />wasted or used excessively, reductions will be made in the amount of material <br />measured for payment purposes. <br />All PVC sewer pipe shall he instniled and bedded in accordance with ASTM <br />specification D-2321, "Recommended Practice for Underground Installation of <br />Flexible Thermoplastic Sewer Pipe." Bedding requirements shall include mech- <br />anical compaction of sand and gravel material surrounding the pipe to at least <br />ninety-five (95%) percent of maximum density as described in AS"rM Methods D698 <br />to prevent deflection of the pipe cross-section. Payment for such bedding and <br />compaction operations shall be considered incidental to the installation of <br />the sewer p'->A. Where existing soils are of non -granular nature, the Contrac- <br />tor shall furnish sand or gravel material for pipe bedding as incidental to <br />w the cost of the pipe. <br />The Owner reserves the right to measure deflection of PVC sewer pipe 30 days <br />p after placement of backfill material in the trench. Deflections greater than <br />five (52) percent of the inside pipe diameter shall be considered failure of <br />1 the bedding procedure and the Contractor shall be required to re -excavate the <br />M trench and provide additional compaction along the side of the sewer pipe with <br />no additional compensation for such work. <br />24 , n00- 2 <br />0-5841c <br />Copvright 1995 <br />Ronestroo, Rosene, Anderlik <br />6 Associatoo, Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.