Laserfiche WebLink
A <br />} The contractor shall be required to cut into a plug on the existing force main <br />as shown on the plans. The cut -in shall be incidental to the force main <br />N construction. <br />t <br />The City has applied for permits required from the Burlington Northern <br />Railroad and the Hennepin County Highway Department. All the requirements of <br />these permits shall become a part of these specifications and be fully <br />complied with by the contractor. The contractor shall post any bond required <br />to obtain the permits. <br />N <br />j Dewatering for sewer construction may be required throughout the project to <br />prevent trench water from entering the pipe and to provide suitable conditions <br />M for laying pipe. All dewatering costs required to complete the work shall be <br />1. considered incidental to the project. <br />Existing driveway and street culvert removal is required as a part of this <br />construction. The street and driveway culverts shall he replaced with new 12" <br />(' RCP at the unit price as bid in the proposal. <br />24,000.3.E.5. STAPTLTZATION: Where, in the opinion of the Engineer, unsuit- <br />able material exists <br />below the pipe, rock stabilization <br />shall be used to in- <br />sure proper bedding. <br />Material shall be 3/4 minus rock, <br />well graded and com- <br />pacted in place below <br />the pipe. Contractor's attention <br />is directed to Para- <br />graph 24,000.3.E5, of <br />the General Conditions. <br />Payment for stabilization <br />shall be by the ton in place <br />at the bid price as <br />stated on the proposal <br />and shall include all m;--cellaneous <br />costs. <br />Where, in the opinion of the Engineer, rock stabilization material is being <br />wasted or used excessively, reductions will be made in the amount of material <br />measured for payment purposes. <br />All PVC sewer pipe shall he instniled and bedded in accordance with ASTM <br />specification D-2321, "Recommended Practice for Underground Installation of <br />Flexible Thermoplastic Sewer Pipe." Bedding requirements shall include mech- <br />anical compaction of sand and gravel material surrounding the pipe to at least <br />ninety-five (95%) percent of maximum density as described in AS"rM Methods D698 <br />to prevent deflection of the pipe cross-section. Payment for such bedding and <br />compaction operations shall be considered incidental to the installation of <br />the sewer p'->A. Where existing soils are of non -granular nature, the Contrac- <br />tor shall furnish sand or gravel material for pipe bedding as incidental to <br />w the cost of the pipe. <br />The Owner reserves the right to measure deflection of PVC sewer pipe 30 days <br />p after placement of backfill material in the trench. Deflections greater than <br />five (52) percent of the inside pipe diameter shall be considered failure of <br />1 the bedding procedure and the Contractor shall be required to re -excavate the <br />M trench and provide additional compaction along the side of the sewer pipe with <br />no additional compensation for such work. <br />24 , n00- 2 <br />0-5841c <br />Copvright 1995 <br />Ronestroo, Rosene, Anderlik <br />6 Associatoo, Inc. <br />