My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
02-11-1985 Council Packet
Orono
>
City Council
>
1985
>
02-11-1985 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/13/2025 11:16:44 AM
Creation date
11/13/2025 11:06:58 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
348
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
I <br />I <br />24,000.3.J. TFSTING FORCE. MAIN PIPE LINES: <br />24,000.3.J.1. Pressure_ During! Tests: After the pipe has been laid and <br />partially backfilled as sn, ified, all newly laid pipe shall be subjected to <br />hydrostatic or air pressure of 100 lbs. per square inch. The test must be <br />c(,ducted under the observation of the Fngineer and with his approval. <br />24,000.3.J.2.. Duration of Pressure Tests: The duration of each pressure test <br />shall be at least 10 minutes. <br />24,000.3.J.3. Procedure: All pipe or sections thoro,f ;hall be slowly filled <br />with water from a safe source if a hydrostatic test is used and the specified <br />test pressure, measured at the lowest point_ of elevation, shall he applied by <br />means of a pump connected to the pipe in a satisfactory manner. The pump, <br />pipe connection, gauges and all necessary apparatus shall be furnished by the <br />contractor. Gauges and measuring devices must meet with t.! approv 1 of the <br />Fngineer and the necessary pipe taps made as required. <br />24,000.3.J.4. Welling Air Before Test: Before applying hydros-,atic test <br />pressure, all air shall be expelled from the pipe. To accomplish this, Laps <br />shall be made, if necessary, at points at highest elevation and afterward <br />tightly plugged. <br />24,000.3.J.5. Examination Under Pressure: All e:�posed pipes, fittings, <br />valves and _joints will be carefully examined during the open trench test. Any <br />crack or defective pipes, fittings, valves or hydrants discovered in <br />consequence of the pressure test shall be repeated until satisfactory to the <br />Fngineer. <br />14 24,000.3.J.6. Permissible Leakage., A drop in pressure over the 30 minute <br />(� test period exceeding 3 pounds shall be cause for .ejection of the project. <br />All leaks shall be corrected and the test repeated until the pressure drop is <br />•hin the 3 pound limit. <br />1J <br />811 14,000.3.J.7. Conductivity: Conductivity shall be provided throughout the <br />')rce main system by use of copper straps or approved conductive gaskets with <br />;r (:,p,er inserts. All fittings shall be mechanical joint with copper straps. <br />is Lea•A tipped gaskets will not be approved for conductivity. <br />Copper jumper straps between section, of pipe shall be not less than 1/16" r <br />3/4" strap bolted to shop welded pipe straps of the same size. Bolts shall be <br />5/16" diameter bronze. For all locations where shop welded straps are not <br />available, field welds shad be made using the radweld method with size 32 <br />cartridge. Each field weld shall be properly made after filing the surface of <br />the pipe to a clean bare metal over the entire area of the weld. Straps <br />bolted to mechanical joint fittings shall be not less than 1/16" x 115". All <br />straps shall ho securely fastened and hackfill placed so as to not damage they <br />conductivity. <br />M <br />I <br />Is <br />24,000-3 <br />0-5841c <br />copyright 1985 <br />Aonestroo, Rosene, Anderlik. <br />6 Associates, Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.