Laserfiche WebLink
r24,000. SFWF.RS <br />Specific Requirements <br />24,000.0. SPECIFICATION RFFF.RENCE: Unless otherwise modified or altered <br />N herein, all sections of the General Requirements shall apply. <br />i <br />24,000.2. MATERIALS: Ductile iron pipe shall be Class 52. PVC sewer pipe <br />w shall he ASTM D 1034, Schedule SDR 35. RCP shall he Class V. <br />1 24,000.2.1. MANHOLE AND CATCH BASIN CASTINGS: Manhole frames and cover shall <br />he Neenah R-1642-I+ or approved equal with two concealed pick holes. Catch <br />basin castings shall he Neenah R3290A. <br />24,000.2.K. PRE -CAST CONCRETE MANHOLES: The cone section of the manhole <br />is shall be reduced to a 27 inch diameter opening by use of an eccentric pre -cast <br />cone made expressly for this purpose. <br />On manholes 8 ft. deep and greater the pre -cast section immPdiate'.v below the <br />�� cone section shall be one W ) foot in height. <br />i <br />The Contractor should note that pre -cast manhole joints shall he of the rubber <br />is 0-ring gasket joint. <br />1+ <br />24,000.3. CONSTRUCTION REQUIREMENTS: The working area available for <br />construction operations is very limited in some areas where sanitary sewer <br />piping is to be placed. Therefore, the contractor will be required to review <br />construction procedures with the Engineer prior to proceeding with the pipe <br />installation in any area. In most areas, the contractor will not be allowed <br />to sidecast material excavated from the trenches for pipe installation. <br />Material excavated from the trenches shall be backcast to minimize disruption <br />of the area. The use of sewer boxes to limit trench width will be required in <br />certain areas of the project. The use of the sewer box shall be incidental to <br />the sewer line construction. <br />Excess material from the sewer trench excavation shall be disposed of off the <br />t Project site by the contractor. <br />r4 <br />The contractor shall construct drop manholes with outside drop structures in <br />accordance with standard Plate No. 1-5. care shall he exercised so that all <br />joints are watertight. <br />The crossing of the Burlington Northern Railroad and County Road No. 146 shall <br />be done in one jacking operation as shown on the plans. Joints shall be <br />welded joints on the stub casing pipe. The void inside of the casing pipe <br />around the carrier pipe e`,911 he filled with sand. <br />The ends of the casing pipe shall be capped with a loose mixture of brick and <br />mortar. Pavment to the contractor shall he at the unit price per foot of <br />jacking as indicated in the proposal which shall include anv costs for <br />sheeting and dewatering. <br />24,00n-1 <br />■" 0-5941c <br />Copyright I9A5 <br />RoneRtroo, Rosene, Anderlik <br />b Associates, Inc.. <br />