Laserfiche WebLink
2341.4. METHOD OF MEASUREMENT: <br />2141.4.1. Bituminous Mixture: The bituminous mixture for each "course" and <br />for patching mixture, including the bituminous material incorporated therein <br />will be measured separately by weight, based on the weights of the loads haul- <br />ed from the mixing plant. Loads shall be weighed on approved scales furnished <br />by the Contractor. <br />2341.4.2. Bituminous Materials: All bituminous materials which are incor- <br />porated into mixtures will be measured by weight. Extraction tests provided <br />by the Owner shall be used to measure the bituminous material for mixture. <br />2341.5. BASIS OF PAYMENT: Payment for "Bituminous Mixture in Place" for each <br />course at the contract price per tor, shall be compensation in full for all <br />costs incidental to its construction except the bituminous materials used. <br />Payment for the "Patching Mixture" at the contract price per ton shall be cor- <br />pensation in full for all costs incidental to the placement of patching mix- <br />tures under this specification (including the removal and disposal of the un- <br />suitable materials) and including the bituminous material incorporated therein. <br />ITEM NO. <br />ITEM <br />2341.504 <br />Bituminous <br />Material <br />for <br />Mixture <br />2341.508 <br />Bituminous <br />Mixture <br />for <br />'gearing Course <br />2341.510 <br />Bituminous <br />Mixture <br />for <br />Binder Course <br />2341.512 <br />Bituminous <br />Mixture <br />for <br />Leveling Course <br />2341.518 <br />Bituminous <br />Mixture <br />for <br />Patching <br />9 i 84- 2 5A <br />Copyright 1984 <br />Soneetron, RoR••ne, Atidorlak <br />i Associates, Ins. <br />UNIT <br />Ton <br />Ton <br />Ton <br />Ton <br />Ton <br />