Laserfiche WebLink
PART II - SL%11TTA1,S REQUIRED FOR APPROVAL <br />OSECTICN 1 - NE19 SYSTEM CONSTRUCTION <br />At the time of filing an application for a building permit for any work requiring a <br />new on-site sewage treatment system, or an installation permit application for a <br />I new system to serve an existing structure, the applicant shall provide a site• evalua- <br />tion report confirming that a conforming system can be installed and maintained on <br />the property. Information required: <br />1. Completed application form. <br />2. Plot plan including primary and alternate drainfield areas. <br />f 3. Site evaluation report: <br />l 4. Design plans and specifications. <br />•SECTION 2 - EXISTING SYSTEM REPAIR OR ALTERATION <br />*At the time of' 'filing an application to repair or alter any existing. <br />on-site sewage treatment system, the applicant shall provide a site evalu- <br />ation report confirming the existing conditions and the extent of the <br />proposed alterations. Non -conforming systems must be made fully conforming. <br />Conforming systems must remain conforming. Information required: <br />i <br />1.-• Completed application form. <br />2. Plot plan locating the existing septic tank(s) and drainfield area(s) <br />and indicating the location of all percolation tests and soil borings. <br />3.. Copy of the current compliance inspection report for the existing <br />system. <br />4. Site evaluation report. Incases involving the construction of a <br />new.drainfield area, the evaluation report shall include 2 soil <br />borings and 4 percolation tests. In cases involving the addition <br />of new drainfield laterals to an existing drainfield, at least <br />one soil boring shall be taken in the proposed area. The City may <br />require 2 or more percolation tests depending upon the soil <br />classification series or.test boring results. <br />S. Design plans and specifications. <br />-7 <br />