My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
#2286 Project Packet
Orono
>
Property Files
>
Street Address
>
B
>
Bayside Road
>
4355 Bayside Road - 06-117-23-13-0005 - New PID
>
4355 Bayside Rd - PID: 06-117-23-12-0007 - Old PID
>
Land Use
>
97-2286, SUBD
>
#2286 Project Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/23/2025 11:26:50 AM
Creation date
10/23/2025 11:25:18 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
95
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
.<O - <br />·- <br />§ ll.03 <br />2. The subdivision is a division of <br />property previously combined for tax purposes; or, <br />3. The subdivision consists only of the <br />creation or alteration of a public or private easement for any <br />purpose. <br />b. <br />Subdivision shall be a <br />procedure established <br />following criteria: <br />"Class II Subdivision" ._ A Class II <br />plat and may qualify for a limited review <br />in this Chapter if it meets all of the <br />1. The subdivision results in no more <br />than two buildable lots, one or both of which are less than five <br />acres (217,800 square feet} of land or one or both of which have <br />less than 300 feet of frontage on a public roadway which has been <br />accepted and opened by the City or on a private roadway open to <br />travel or vehicular use pursuant to an easement between persons or <br />between persons and the City1 and, <br />2. The subdivision does involve the <br />vacation or dedication of public roadways or extension of municipal <br />utilities; and, <br />3. The subdivision does not involve any <br />flexible zoning application; and, <br />4. The subdivision may include the <br />creation of outlets and easements for access, open space, flowage, <br />conservation, etc. in addition to the two buildable lots. <br />~ c. "Class III Subdivision 11 <br />-A Class III <br />Subdivision shall be a plat which includes, but Is not limited to, <br />a subdivision which meets one or more of the following cr£teria: <br />1. The subdivision results in three or <br />more buildable lotsi or, <br />zoning application; or, <br />2. The subdivision involves a flexible <br />3. The subdivision involves the vacation <br />or dedication of a public roadway; or, <br />4. The subdivision involves the extension <br />of municipal utilities. <br />67. ''Temporary Improvement" -Improvements built and <br />maintained by a subdivider during construction of the subdivision. <br />6 8. <br />parce 1 s of 1 and <br />controlled by the <br />subdivision. <br />ORONO CC <br />''Tract ( or Subject Tract) 11 <br />-The parce 1 or <br />comprising all the contiguous land owne~ or <br />subdivider and included in whole or part in the <br />425 (4-1-84} <br />09L=0N ?0/£o: iQ 2.0:oL 2.6/S0/20 0LS0£.l?2L9 S 0N0~0 .:10 ,UD
The URL can be used to link to this page
Your browser does not support the video tag.